My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002 DIESEL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
INSTALL_2002 DIESEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:29 PM
Creation date
11/6/2018 11:56:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002 DIESEL
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\DIESEL INSTALL PLAN 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be made with the inside of the tank,or 9.2.1.2 Pre-mix resin with filler material and <br /> possibly at the lift lug, if steel is exposed,prior to catalyst. Apply generously to tank <br /> application of the lift lug cover. No current shall surface at lift lug and to bottom of FRP <br /> pass through the factory installed flange gaskets, cap, Place cap over lift lug. Apply <br /> Isolation of the fittings is required to assure tank additional resin with filler and catalyst <br /> integrity. around edges of cap to seal. AJ16W to <br /> cure. <br /> 8.3 If the tank is to be installed near an impressed 9.2.2 As an alternative to Paragraph 9.2.1, <br /> current system, the effect of the system must be exposed steel at the lift lugs may be <br /> considered on the ACT-1000 tank. The covered with the laminate via the repair <br /> corrosion consultant must consider including the kit supplied by the manufacturer. <br /> ACT-1000 tank into the design of the impressed 9.2.2.1 Follow the manufacturer's instructions <br /> current system. given in the repair kit. <br /> 9.0 SEALING of PIPE CONNECTIONS, LIFTING 9.3 After application, the installer shall verify that the <br /> LUGS and REPAIRS repair work has cured (adequate material <br /> hardness and solidification) prior to backfill. <br /> 9.1 Clean areas to be repaired through removal of <br /> surface rust, dirt, contaminants, and disbonded 9.4 After an air test has established tightness, tank <br /> laminate. The laminate and surface coat fittings shall receive a coat of resin prior to <br /> surrounding all holidays,laminate flaw areas, lift backfill. (Refer to Section 9 for surface <br /> lugs and/or exposed steel areas shall be surface preparation). Resin coating shall include the <br /> prepared by using a coarse grit sandpaper or entire plug on unused fittings. <br /> grinder. (Refer to SSPC SP-2"Hand Tool *' <br /> Cleaning"or SP-3'Power Tool Cleaning"for 9.5 Follow temperature guidelines supplied bathe <br /> additional guidance). This process shall remove manufacturer for proper catalyst/resin ratl6s and <br /> all glossiness from the surface surrounding the recommendations. Ideally, exterior tempejature <br /> repair area. Repair the area by using the repair shall be within the 60-80°F(15.5-26.6'C)range. <br /> kit supplied by the manufacturer. Temperatures below 50'F(10°C)shall require an <br /> external heat source to enable a chemical <br /> 9.2 During the installation process,steel can reaction to proceed, <br /> become exposed at the lift lugs due to handling <br /> of the tank or at the interface between the'steel 10.0 FINAL BACKFILL <br /> tank and either the nylon bushing or gasket <br /> These areas must be repaired by one of the 10.1 Homogeneous backfill similar to bedding <br /> following methods, material shall be carefully placed around the <br /> 92.1 A di-electric cap, if supplied by the entire tank and to a depth of at least one foot <br /> manufacturer, shall be placed over each (305 mm)over the tank. (See NFPA 30 and <br /> lift lug. First, prepare the surface of the state or local codes for a minimum depth of <br /> tank to be bonded to the cap in cover required), <br /> accordance with paragraph 9.2. Apply <br /> the cap to the tank in accordance with <br /> paragraph 9.2.1.1 or 9.2.12). <br /> ®® yi <br /> .8'REINFORCED <br /> ':':•'^ 'CONCRETE <br /> ' 0S <br /> �•• '':['• OR 8'I15F11AL7 <br /> vd•. <br /> 9.2.1.1 Place cap over lifting lug. Pre-mix resin <br /> with catalyst and apply around the cap 10.2 If laminate damage occurs after holiday testing <br /> and the tank surface immediately or during ball operation, repairs shall be <br /> adjacent to the cap. Bond the cap to the made in accordance with Section 9. <br /> tank with two layers of fiberglass mat // <br /> previously saturated with resin. 11.0 MAINTENANCE Y <br /> Roll out 211 air bubbles and air pockets, <br /> or as an alternative, see paragraph 11.1 The primary tank should be inspected monthly <br /> 9.2.1.2. for the presence of water. Inspection should <br />
The URL can be used to link to this page
Your browser does not support the video tag.