My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO JAN 2016 - MAY 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO JAN 2016 - MAY 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:50:53 PM
Creation date
11/7/2018 12:00:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JAN 2016 - MAY 2016
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO JAN 2016 - MAY 2016.PDF
QuestysFileName
COMPLIANCE INFO JAN 2016 - MAY 2016
QuestysRecordDate
9/13/2016 6:48:08 PM
QuestysRecordID
3085841
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Awl f i zm_ <br /> Vaporless Ananufacturing, Inc. <br /> Quality Petroleum Equipment Solutions For Over 20 Years <br /> -� ® <br /> 3c <br /> Highest Performance, <br /> Most Requested Mechanical Line Leak Detector Built Today! <br /> • Any Fuel* <br /> - Alcohols, Biodiesel, Aviation, Gasoline, Diesel <br /> • Any Pump* <br /> • Electronic Interface Available <br /> • Longest Length Pipeline System* <br /> • Largest Volume Pipeline System* <br /> • Integrated Check Valve / Pressure Relief <br /> • Field Adjustable Leak Threshold <br /> • Now Available! Factory Certifications for Installation <br /> and Annual Testing** <br /> The 99 LD-2000 is the most requested mechanical line leak detector built today. New <br /> engineering and the Vrni 2-year warranty (after installation) make the 99 LD-2000 more <br /> attractive to station operators today than ever before. Not only is the 99 LD-2000 less <br /> expensive to own, it is faster and less subject to field and line variables than ever before! <br /> Integrated In-Line Check Valve/ Pressure Relief <br /> A leaking check valve in the turbine, defective submersible pump pressure relief, or a defective <br /> bypass valve will allow the line system to depressurize, resetting the leak detector. Drain- <br /> back into the tank and thermal contraction will cause vapor pockets to form. Vapor pockets <br /> increase the length of time it takes for a leak detector to open to full flow. Pump problems <br /> such as these result in slow flow and technical support calls. The resulting service costs and <br /> customer dissatisfaction all take away from the bottom line - making money. <br /> The 99 LD-2000 Is The Only 2" Mechanical Line Leak Detector <br /> Capable Of Holding Line Pressure After The Pump Is Off, <br /> Even With Pump Component Wear Or Failure. <br /> *See Technical Specifications on last page. RECEIVED <br /> **Contact factory for details v Ems' <br /> MFM HFR MAY II <br /> r3=2Qi5 <br /> in ivw,ln'L'� U.S. Patent No.4,966,190 • Designed and Manufactured in U.S.A. ENVIRONMENTAL <br /> 1JC4#TU nCDGBTBAC"T <br />
The URL can be used to link to this page
Your browser does not support the video tag.