My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO JAN 2016 - MAY 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
930
>
2300 - Underground Storage Tank Program
>
PR0502817
>
COMPLIANCE INFO JAN 2016 - MAY 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:50:53 PM
Creation date
11/7/2018 12:00:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
JAN 2016 - MAY 2016
RECORD_ID
PR0502817
PE
2361
FACILITY_ID
FA0005584
FACILITY_NAME
VALLEY PACIFIC LODI PLANT & CARDLOCK
STREET_NUMBER
930
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905023
CURRENT_STATUS
01
SITE_LOCATION
930 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\930\PR0502817\COMPLIANCE INFO\COMPLIANCE INFO JAN 2016 - MAY 2016.PDF
QuestysFileName
COMPLIANCE INFO JAN 2016 - MAY 2016
QuestysRecordDate
9/13/2016 6:48:08 PM
QuestysRecordID
3085841
QuestysRecordType
12
QuestysStateID
1
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vmi 99 LD-2000 Leak Detector <br /> In addition to the previously described submersible pump problems encountered without an in-line check <br /> valve, the metering portion of the leak detector is hammered by hydraulic shock.This results in leaks going <br /> undetected.Those leak detectors are just not equipped for the job you purchased them for. <br /> The 99 LD-2000 is the answer you have been looking for. Vrm leak detectors, with an integrated check <br /> valve and pressure relief valve, will save money, reduce customer frustration at the dispenser and reduce <br /> service calls. <br /> Shortest Leak Detector Profile <br /> The 99 series leak detectors are the lowest profile leak detectors available today. <br /> Higher Level of Performance <br /> The 99 LD-2000 has a higher level of performance over a broader range of burial depth, line length, <br /> and piping system types than any other leak detector. <br /> Additional Features ( r��Vp <br /> • Over 20% increased flow capacity <br /> • Guaranteed for 24 months from date of installation to detect 3 GPH @ 10 PSI leak MAY 01015 <br /> • One-Way Poppet flow pathjR <br /> • Reverse Ratio Piston /Poppet combination ONMENTA,L <br /> • Smaller volume-faster response piston size HEALTH OFpARTMENT <br /> • Shortest profile leak detector available for the "tight" installations <br /> • All fuels: gasoline, diesel, alcohols, Biodiesel, Aviation; see Fuels under technical specifications. <br /> • All pipelines (flexible-fiberglass-steel) up to 400 ml. resiliency <br /> • Exceeds EPA regulations (3 GPH @ 10 PSI) <br /> • Detects leaks up to 10' above the leak detector <br /> • Installs with 2" six point socket or pipe wrench <br /> Increased Flow Capacity <br /> The 99 LD-2000 has maximized the flow and flow path in existing, older submersible pump heads. This new <br /> design allows over 20% more flow than previous LD-2000 models, maximizing pump performance for earlier <br /> pump housings. <br /> Longest Guarantee <br /> The 99 LD-2000 shares the longest guarantee available in the industry, along with all other Vml 99 LD-2000 <br /> series leak detectors and the 99 LD-3000 series leak detectors. For 24 months from date of installation, the <br /> 99 LD-2000 is guaranteed to see a 3 GPH leak @ 10 PSI. <br /> Field Adjustable Leak Threshold <br /> All Vrm mechanical line leak detectors have been tactory assembled and tested to meetthe EPA IeaK detection <br /> threshold established during certification testing. Abnormal field conditions such as high line resiliency(high <br /> bleed-back), pump pressures over 30 PSI and high head pressures affect line leak detection sensitivity. <br /> Additionally, wear affects performance of leak detection over time. To meet these issues, Vmi established <br /> through certification testing,the ability offield technicians to adjust Vrm mlld's to compensate for field variables <br /> and normal wear. Please read Technical Bulletin 032505 for specific instructions on this feature. <br /> One-Way Poppet Flow Path <br /> The One-Way Poppet Flow Path isolates pump turbulence from line leak detection at pump start-up. The <br /> hardened stainless steel poppet does not dimensionally change because of thermal conditions encountered <br /> during station operation (precision metering change is insignificant down to-20° F). <br />
The URL can be used to link to this page
Your browser does not support the video tag.