Laserfiche WebLink
Jun 07 06 0932p Mike Dotten 209-533-2650 p.3 <br /> Facility: Linden Associated Growers Page 3 <br /> In-Tank Cauging/SIR Equipment: <br /> ❑Check this box if tank gauging is used only for inventory control and disregard the following section. <br /> ZCheck this box if no tank gauging or SIR equipment is installed and disregard the following section. <br /> (This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring). <br /> Complete the foliowin checklist: <br /> ❑Yes ❑No" Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? " <br /> ❑Yes ❑ No* Were all probes reinstalled properly? <br /> ❑Yes ❑ No Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD).- <br /> Check <br /> LLD):Check this box if LLDs are not installed and disregard the following section. <br /> ❑Yes []No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Check all that apply) Simulated leak rate: El g.p.h.; ❑0.1 g.p.h; ❑ 0.2 g.p.h. <br /> ❑Yes [❑ No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> El Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑Yes [] No" For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ❑Yes ❑ No* For electronic LLDs. does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> Q Yes ❑No* For electronic LLDs,does the turbine automatically shutoff if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes ❑No* For electronic LLDs.have all accessible wiring connections been visually inspected? <br /> ❑NIA <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> x In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: No deficiencies. <br /> Page 3 of 3 03101 <br />