Laserfiche WebLink
Jun 14 05 10: 09p Mike Datten t20� 533-2650 p. 2 <br /> Vacility: Linden Associated Growers Page 2 <br /> D. Results of Testing/Servicing <br /> Software Version Installed:NIA <br /> Complete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> ®Yes ❑ No* Is the visual alarm operational? <br /> ❑Yes ❑ No* Is the print function operational? Z Not installed. <br /> ®Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ®Yes ❑ No* Were all sensors installed at lowest point of secondary contain-ment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> El Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> 0 NIA operational? <br /> ❑Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> NIA monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors: <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ❑Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so,at what percent of tank cMacity does the alarm trigger? <br /> M Yes* ❑ No Was any monitoring equipment replaced? If ycs, identify specific sensors, probes, or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ®Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> Product; 0 Water, If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring stem set-up reviewed to ensure propCT settings?Attach set u re rts, ifa livable <br /> 0 Yes ❑ No* Is all monitoring equipment o rational r manufacturer's specifications? <br /> *In Section:E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: No Deficiencies. <br /> Page 2 of 3 03101 <br />