Laserfiche WebLink
,Jun 22 03 05: 32p Mik 4 <br /> Dotten 209- 33�-2650 p. 3 <br /> ` <br /> In-Tank Gauging/SIR Equipment: <br /> ❑Check this box if tank gauging is used only for inventory control and disregard the following section. <br /> ®Check this box if no tank gauging or SIR equipment is installed and disregard the following section. <br /> (This Section must be completed if in-tank gauging equipment is used to perform leak detection monitoring). <br /> Com Tete the foll ing checklist: <br /> ❑Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> © Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑Yes QNo* Was accuracy of system water level readings tested? <br /> Q Yes <br /> f <br /> No* Were all probes reinstalled properly? <br /> No's Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> Check this box if LLDs are not installed and disregard the following section. <br /> ❑Yes [] No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ U g.p.h_ <br /> ❑Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes (] No Was the testing apparatus properly calibrated? <br /> ❑Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ❑Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ NIA malfimetions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ❑Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: No other deficiencies. <br /> Page 3 of 3 03101 <br /> I <br />