My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
14175
>
2300 - Underground Storage Tank Program
>
PR0234383
>
COMPLIANCE INFO_1992-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/7/2018 12:04:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2005
RECORD_ID
PR0234383
PE
2361
FACILITY_ID
FA0003670
FACILITY_NAME
REYNOLDS PACKING CO QUALITY BIN
STREET_NUMBER
14175
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
051-050-05
CURRENT_STATUS
02
SITE_LOCATION
14175 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\T\HWY 26\14175\PR0234383\COMPLIANCE INFO 1992-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' swRh,.rarittary zooz <br /> 0 Page�of ni <br /> G. PIPING SUMP TESTING <br /> Test Method Developed By: X Sump Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Spee) <br /> Test Equipment Used: fncon Equipment Resolution: <br /> Sump# Sump# Sump # Sump # <br /> Sump Diameter. <br /> Sump Depth: <br /> 7 <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?' Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was fail-safe verified to be <br /> operational?` Yes No NA Yes No NA Yes No NA Yes No NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(Rf): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: +/- .032 +/- .002 +/-.002 +/-.002 <br /> I eStResu$ Pass- Fail Pass, Fail Pass FailPasse Fail <br /> Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and Yes No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> _ res T-sf� ,zaze2d OL Z <br /> r l e. 1 vti2 Tn r <br /> t j <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRC$ LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.