Laserfiche WebLink
SWACB, January 2002 Page--,7 of <br /> 4. S49L/OVERFILL CONTAINMENT BOA <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/OverfiIl Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: X Spill Bucket Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify,) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Visual I Equipment Resolution: <br /> Spill Box# Spill Box#b^ Spill Bax# Spill Box# <br /> Bucket Diameter: `a <br /> Bucket Depth: /z:,12-.r <br /> Wait time between applying <br /> pressure/vacuum/water and �d mf%•� �d,�� <br /> starting test: <br /> ffEnd <br /> e: 7 <br /> g JR,): 11 ., <br /> e; : 34 .¢-,�• ; 3.�, <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> TestResult: ass Fail; as , Fail`. Pass= Fail: Pass Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />