Laserfiche WebLink
. 'SWRCB, January 2002 Page� of '� <br /> T. UNDE�ISPENSER CON'TAINMENT(UDC) `1�T1NG <br /> Test Method Developed By: X UDC Manufacturer X Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum X Hydrostatic <br /> Other(Specify) <br /> WTIestiEquipnment Used:Incon Equipment Resolution: <br /> UDC# 2 UDC# -UDC # <br /> UDC Manufacturer: /&_ l <br /> UDC Material j <br /> UDC Depth: a Z a <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: om <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: YAW <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes No Yes No Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- �� <br /> safe shutdown?' Yes No �:_-' Yes No Yes No NA Yes No NA <br /> Was fail-safe verified to be <br /> operational?� Yes No Yes No Yes Na NA Yes No NA <br /> Wait time between applying <br /> pressure/vacuum/water and 15 j1'I/ /s/M ice/ <br /> starting test <br /> Test Start Time: y 45; <br /> Initial Reading (Rj): E?q 5 35 <br /> Test End Time: $ � � - <br /> Final Reading(RF): - & • 3 <br /> Test Duration: y / /S H9%Al <br /> Change in Reading(RF-R[): 5- <br /> Pass/Fail Threshold or Criteria: <br /> +/-.002 +/--.002 +/-.002 +/-.002 <br /> estitesult. CPas Fail Pass- Fail Pass Fail <br /> Was sensor removed for testing? es No NA Yes o NA Yes No NA Yes No NA <br /> Was sensor properly replaced and No NA yes No NA Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up far failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO" or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />