Laserfiche WebLink
10/03/2007 22:50 FAX 2095332650 ALLTECII PETRO INC LIA SAN JOAQUIN Q001 <br /> 17759 Buttercup Circle, Sonora, CA 95370 <br /> Phone: 209-532-7320; Fax: 209-533-2650 ` <br /> California Contractor 623541 A-Haz 1 <br /> alltech@getrocket.com <br /> MONITORING SYSTEM CERTIFICATION <br /> A. General Information <br /> Facility Name:Linden Associated Growers Date of Testing/Servicing:June 29,2007 <br /> Facility Address: 14175 E.Hwy 26,Linden CA 95326 <br /> Facility Contact Person: Charlie Busalacchi Contact Phone No.:209-9314800 <br /> Regulatory agency: San Joaquin Health;Inspector:Toua.Yang;Phone:468-3459;Fax 468-3433 <br /> Make/Model of Monitoring System: Veeder-Root ILS-250 <br /> E <br /> re ort is a:❑Prelimina Re rt nresolve�l Issues Exist or a: Final Re nrt(Facili was observed to be in Com liance <br /> D:Gasoline Compartment Tank ID:Diesel Compartmant <br /> ank Gauging Probe. Model:None <br /> ular Space or Vault Sensor, Model:.Float Switch ❑[n-Tank Gauging Probe, Model:None <br /> ng Sump Annular Space or Vault Sensor. Model:Shared with Gas side <br /> Model:None ❑Piping Sump Model:None <br /> Sump Sensor(s)_ Model:None ❑Fill Sum Sensor(s). <br /> hanical Line Leak Detector. Model:None PModel:None <br /> tronic Line Leak Detector. Madel:Nonc ❑Mechanical Line Leak Detector. Model:None <br /> k 0ve>ftt/High Level Sensor. Model:Drop Tube ❑Electronic Line beak Detector. Model:None <br /> pill buckets tested ®Pass ❑Fail ®Tank Overfill r High-Level Sensor. Modes:Drop Tube <br /> r 0 Fillspill buckets tested ®Pass ❑Fail <br /> ❑Other <br /> Tank 1D: <br /> Tank ID: <br /> ❑In-Tank Gauging Probe. Model: <br /> ❑Annular Space or Vault Sensor. Model: ❑In Annular <br /> Gauging Probe. Model: <br /> ❑Piping Sump ❑Annular Space or Vault Sensor, Model: <br /> Model: ❑Piping Sump <br /> ❑Fill Sump Sensor(s). Model: Model: <br /> ❑Mechanical Line Leak Detector. Model: ©Fill Sump Sensor(s). Model: <br /> ❑Electronic Line Leak Detector. Model: ❑Mechanical Line Leak Detector. Model: <br /> ❑Tank Overfill/High-Level Sensor. Model: ❑Electronic Line Leak Detector. Model: <br /> Ej Fillspill buckets tested ❑Tam Overfill 1High-level Sensor. Model: <br /> ❑Pass []Fail ❑Fillspill buckets tested []pass Other ❑Fail <br /> ❑Other <br /> Dispenser ID:Gas®Sump:®Dry❑Water❑Product Dispenser ID:Diesel <br /> ®Dispenser Containment Sensor(s). Model:Float SW. 208 Sump:®Dry❑Water❑Product <br /> ( ) ®Dispenser Containment Senses{))_ Model:Float Switch(208) <br /> [�Shear Valve(s) (Functional test) <br /> ❑ <br /> DispenserFShear <br /> Containment Float(s)and Chain_ ❑Shear Valve(s) iFunctional test) <br /> ❑Dis enser Containment Float() and Chain() . <br /> r 1D: ❑Sump:❑Dry❑Water❑Product Dispenser ID: <br /> ser Containment Sensor()}. Model: ❑Sump:�DrS ❑Water❑Product <br /> ®Dispenser Containment Sensor(s). Model. <br /> Valve(s) (Functional test) <br /> ser Containment Float(s)and Chain(s). El Shear Valve(s) (Functional test} <br /> ❑Dispenser Containment Float(s)and Chain(s). <br /> 1D: ❑Sump.❑Dry❑Water Product <br /> ❑ Dispenser 1D: [3 Sump:❑Dry❑Water❑Product <br /> ser Containment Sensor(s). Model: ❑Dispenser Containment Sensor()), Model: <br /> Valves) (Functional test) <br /> ser Containment Float(s)and Chain(s). ❑Shear Valve()) (Functional test) <br /> ❑Dis enser Containment Float(%)and Chain(s). <br /> C. Certification - 1 certify that the equipment identified in this document was inspected/serviced in accordance with the <br /> manufacturers' guidelines. Attached to this Certification is information(e.g, manufacturers' checklists)necessary to verify that this <br /> information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br /> reports,I have also a y of t o port;(check all that apply). E]System set-up ❑Alarm history report <br /> Technician: Mike Dotten,California Contractor License.No.:623541 <br /> Certification: Veeder-Root:A23046;Level 4. ICL;UST Technician <br /> #5259412 <br /> Page I of 3 <br /> 03!01 <br />