My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
14175
>
2300 - Underground Storage Tank Program
>
PR0234383
>
COMPLIANCE INFO_1992-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/7/2018 12:04:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2005
RECORD_ID
PR0234383
PE
2361
FACILITY_ID
FA0003670
FACILITY_NAME
REYNOLDS PACKING CO QUALITY BIN
STREET_NUMBER
14175
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
051-050-05
CURRENT_STATUS
02
SITE_LOCATION
14175 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\T\HWY 26\14175\PR0234383\COMPLIANCE INFO 1992-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/03/2007 22:50 FAX 2095332650 ALLTEC$ PETRO INC y LIA SAN JOAQUIN <br /> 10 002 <br /> Facility: Linden Associated Growers Page 3 <br /> In-Tank Gauging I SIR Equipment: <br /> []Check this box if tank gauging is used only for inventory control and disregard the following section. <br /> NCheck this box if no tank gauging or SIR equipment is installed and disregard the following section. <br /> (This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring). <br /> Com lets the foliowin checklist: <br /> ❑Yes ❑ Now Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> []Yes ❑Now Was accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ro Yes ❑ No" Were all probes reinstalled properly? <br /> ❑Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ® Check this box if LLDs are not installed and disregard the following section. <br /> ❑Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perforntance? <br /> ❑N/A (Check all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.I g.p.h; [10.2 g.p.h. <br /> ❑Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory.requirements? <br /> ❑Yes ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑We For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring systemjsystem <br /> ❑N/A or disconnected? <br /> ❑Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitor <br /> ❑NIA malfunctions or fails a test? <br /> ❑Yes ❑No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * in the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments:No deficiencies. <br /> Page 3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.