My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2300 - Underground Storage Tank Program
>
PR0232535
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:41 PM
Creation date
11/7/2018 8:42:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0232535
PE
2361
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
02
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2526\PR0232535\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
6/21/2016 6:09:05 PM
QuestysRecordID
3121830
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. X Tank cross-sectional diagram included on blueprints. <br /> 5. N/A Detail of tank, piping system, excavation and cover. b6V� Dir <br /> 6. X Tank(s) and piping approved by a nationally recognized independent testing <br /> organization. [Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 2635] <br /> 7. x Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> 8. N/A Manufacturer's written installation instructions for tank(s), piping, monitoring <br /> devices, etc. (Section 2635 (b) (5)] <br /> 9. Tightness Test (NFPA 30) is required on both primary (1°) and secondary <br /> (2 ) containment systems before covering. [Section 2635 (b) (6) & (7)] �►9 <br /> 10. X Double walled tanks using pressure or vacuum testing to monitor the annular " <br /> space. [Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank <br /> in operating condition. Test results to be submitted directly to PHS/EHD <br /> from the testing company or owner of facility. [Health & Safety Code, <br /> Division 20, Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # # # # # # <br /> 1 Z <br /> CAPACITY 1 ,000 <br /> MANUFACTURER ModernWeldin <br /> COMPOSITION Steel <br /> MODEL STI-P3 <br /> PRODUCT Waste 0i1 <br /> CORROSION <br /> PROTECTION Yes <br /> U.L. LISTED Yes <br /> COMPATIBILITY <br /> WITH 100% <br /> METHANOL Yes <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.