Laserfiche WebLink
4. X Tank cross-sectional diagram included on blueprints. <br /> 5. N/A Detail of tank, piping system, excavation and cover. b6V� Dir <br /> 6. X Tank(s) and piping approved by a nationally recognized independent testing <br /> organization. [Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 2635] <br /> 7. x Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> 8. N/A Manufacturer's written installation instructions for tank(s), piping, monitoring <br /> devices, etc. (Section 2635 (b) (5)] <br /> 9. Tightness Test (NFPA 30) is required on both primary (1°) and secondary <br /> (2 ) containment systems before covering. [Section 2635 (b) (6) & (7)] �►9 <br /> 10. X Double walled tanks using pressure or vacuum testing to monitor the annular " <br /> space. [Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank <br /> in operating condition. Test results to be submitted directly to PHS/EHD <br /> from the testing company or owner of facility. [Health & Safety Code, <br /> Division 20, Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # # # # # # <br /> 1 Z <br /> CAPACITY 1 ,000 <br /> MANUFACTURER ModernWeldin <br /> COMPOSITION Steel <br /> MODEL STI-P3 <br /> PRODUCT Waste 0i1 <br /> CORROSION <br /> PROTECTION Yes <br /> U.L. LISTED Yes <br /> COMPATIBILITY <br /> WITH 100% <br /> METHANOL Yes <br /> 4 <br />