Laserfiche WebLink
y ./ <br /> 13. TANK(s) TO BE INSTALLED <br /> N/A A. Steel-clad with fiberglass reinforced plastic. <br /> NLA B. Holiday test required immediately before "setting" tank(s) (35,000 - <br /> 40,000 volts). [Section 2635 (b) (4)] <br /> N/A C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require air testing and soaping <br /> prior to installation. <br /> D. Non-c;ad steel tank [Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and <br /> 42) <br /> components (nuts, bolts, washers, etc.). <br /> Approved by a corrosion engineer or N.A.C.E. <br /> technician. <br /> (3) Document stating inspection method and frequency <br /> (minimum semi-annual inspection requirement). <br /> N/A E. Other types of tanks. <br /> (1) Chemical composition of material stored is provided. <br /> (2) Chemical abstract service number(CAS#) <br /> 14. Overflow protection systems (detail drawing of spill catchment basin(s)/piping <br /> sump(s) required). [Section 2635 (b) (8)] <br /> X A. Spill catchment basin. <br /> X Capacity: > 5 Gal <br /> X Type: Spill catchment �&ngkyvc" M"n- - t11 P`(� <br /> 5 <br />