My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 4:34:37 PM
Creation date
11/7/2018 9:23:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 2011-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 • <br />C QW! d%Arn ADV PiPR TFRTYNR <br />• Page of <br />J. V111.V�.Y�u�i a <br />Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br />0 Other (Spec) <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />Piping Run #1 Piping Run #2 <br />Piping Material: Fiberglass Fiberglass <br />Equipment Resolution: 1/10-15 PSI <br />Piping Run # 3 Piping Run # <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 350' <br />Approx. 350' <br />Approx. 300' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />Diesel <br />Method and location of <br />i in -run isolation: <br />Test boot at STP #1 <br />Test boot at STP #2 <br />Test boot at STP #3 <br />Wait time between applying <br />pressure and starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />10:05 <br />9:45 <br />10:15 <br />Initial Reading (Rj): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test End Time: <br />11:05 <br />10:45 <br />11:15 <br />Final Reading (RF): <br />3 Psi <br />3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -Rt): <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result T^ • <br />X Pass'- 0 Fail <br />X Pass Fail <br />X Pass ❑ Fail Pass ': Fail <br />Comments (include information on repairs made prior to testing and recommendedfollow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.