Laserfiche WebLink
TECHNICAL SPECIFICATIONS <br /> USING NSS 37E EPDXY/FRP TANK LININGS <br /> PAGE 4 <br /> 3. CLEANING AND SURFACE PREPARATION <br /> A. Employees entering the tank and those handling tank sludge, <br /> will be fully clothed so that arms , legs , head and torso <br /> are protected from contact with the tank residue and the <br /> coating resins , and shall wear oil and water resistant <br /> boots and gloves . In addition, protective respiratory <br /> equipment providing positive air pressure, in a full <br /> facepiece. mask, will be worn by those entering the tank <br /> before and during the sediment and water removal, <br /> sandblasting and removal of residue and during the lining <br /> application. Protective equipment shall be provided, used <br /> and maintained in a sanitary and reliable condition. <br /> Persons working in the tank when respirators are required, <br /> will be equipped with safety harnesses and safety lines. <br /> Standby employees shall be available and capable of lifting <br /> workers from the tank in an emergency. Communications <br /> shall be maintained on a constant basis between the workers <br /> and the stand-by employees. <br /> B. Inspection of the interior may be made with one of several <br /> forms of internal inspection lamps or flashlights approved <br /> for Class 1, Division 1 , Group D Hazard locations. <br /> C. Pumps used for the removal of bottom sediment and water <br /> shall be explosion proof. Shovels used to remove solid <br /> sludge shall be of the non-ferrous or sparkproof type. <br /> D. The interior tank surfaces are to be sandblasted to a white <br /> metal finish. The shovels used to remove the residue shall <br /> be the same as in 3. C. above. All corrosion, scale, sand <br /> and dirt are to be removed and walls shall be vacuumed <br /> clean. Sandblasting and prime coating shall not take longer <br /> than 8 hours . <br /> E. Holes are to be located and plugged with boiler plugs , base <br /> resin, trowel material and reinforced with glass fibers. <br /> Seams are to be filled with trowel material to give a <br /> smooth surface for better application of the liner. <br /> 4. LINER APPLICATION <br /> A. The resin prime coat shall be applied immediately after the <br /> sandblasting is complete and must begin not later than 8 <br /> hours following the time the surface was blasted and before <br /> any sign of visible rust bloom. If visible rust is <br /> apparent, the surface shall be reblasted prior to priming. <br /> B. The laminate and seal coat shall be applied next according <br /> to the attached specifications. It shall be not less than <br /> 110 mils in thickness with no drips, runs , or sags. <br />