My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1245
>
2300 - Underground Storage Tank Program
>
PR0502971
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 10:05:02 AM
Creation date
11/7/2018 9:36:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0502971
PE
2381
FACILITY_ID
FA0005633
FACILITY_NAME
SJ BEVERAGE CO
STREET_NUMBER
1245
Direction
W
STREET_NAME
WEBER
STREET_TYPE
ST
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
1245 W WEBER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEBER\1245\PR0502971\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
8/14/2017 9:18:00 PM
QuestysRecordID
3578369
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> TECHNICAL SPECIFICATIONS <br /> USING NSS 37E EPDXY/FRP TANK LININGS <br /> PAGE 5 <br /> 5. INSPECTION <br /> A. The CONTRACTOR is to notify the Owner or his Agent of the <br /> scheduled starting time of the prime coat application so <br /> that, if desired, an inspection of the sandblasted surface <br /> can be made. <br /> B. The CONTRACTOR is to notify the Owner or his Agent of the <br /> time scheduled for the closing of the tank so that an <br /> inspection of the liner can be made. <br /> 6. CLOSING OF THE TANK <br /> A. Where no hatch cover exists , and a manhole has been cut out, <br /> the tank should be sealed as follows; <br /> 1 . The cover plate should overlap the hole at least 2" on <br /> each side and shall be rolled to match the contour of <br /> the tank. The cover plate shall be bolted on 5" centers and <br /> properly sealed to eliminate leakage. <br /> B. Tanks being tested following the liner installation shall be <br /> done at the owners sole expense. <br /> C. The lining application operation shall be conducted with <br /> care not to damage work which is to remain in place, and all <br /> existing work damaged by such operations shall be repaired or <br /> replaced without additional expense to the owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.