My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2002 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:04:48 PM
Creation date
11/7/2018 10:05:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2004
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\COMPLIANCE INFO 2002 - 2004 .PDF
QuestysFileName
COMPLIANCE INFO 2002 - 2004
QuestysRecordDate
7/26/2018 10:41:38 PM
QuestysRecordID
3948516
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> Page 2 of 7 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard X Professional Engineer' <br /> Other(Specify) <br /> Test Method Used: Pressure X Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Vacuum Pump Equipment Resolution: <br /> Tank# 1 Tank# 2 Tank# 3 Tank# 4 <br /> Is Tank Exempt From Testing?' Ll Yes F✓ No D Yes 0 No E:]Yes E No 0 Yes Z No <br /> Tank Capacity: 10,000 10,000 1,000 1,000 <br /> Tank Material: Fiberglass/Steel Fiberglass/Steel Fiberglass/Steel Fiberglass/Steel <br /> Tank Manufacturer: Unknown Unknown Unknown Unknown <br /> Product Stored: Unleaded Diesel Waste Oil Hydraulic Oil <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: 30 Min 30 Min 30 Min 30 Min <br /> Test Start Time: 09:30 09:30 14:00 14:45 <br /> Initial Reading(Ra): 5 Hg 5 Hg 5 Hg 5 Hg <br /> Test End Time: 10:30 10:30 15:00 15:45 <br /> Final Reading(RF): 5 Hg 5 Hg 5 Hg 5 Hg <br /> Test Duration: 1 Hr I Hr I Hr I Hr <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 2 Hg 2 Hg 2 Hg 2 Hg <br /> Test Result: L-11 Pass Fail FY] Pass Q Fail 0 Pass 0 Fail [�] Pass 0 Fail <br /> Was sensor removed for testing'? Eyes No NA RIYes n NA ✓ es E]No []NA ✓Yes []No®NA <br /> Was sensor properly replaced and ❑ � ❑ <br /> verified functional after testing? ✓ es Na A Yes o NA Yes No A �/Yes o NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.