My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2002 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:04:48 PM
Creation date
11/7/2018 10:05:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2004
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\COMPLIANCE INFO 2002 - 2004 .PDF
QuestysFileName
COMPLIANCE INFO 2002 - 2004
QuestysRecordDate
7/26/2018 10:41:38 PM
QuestysRecordID
3948516
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer Industry Standard X Professional Engineer <br /> Other(Specify) <br /> Test Method Used: X Pressure Vacuum Hydrostatic <br /> Other(Spect&) <br /> Test Equipment Used: Compressor Equipment Resolution: <br /> Piping Run# 1 Piping Run# 2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Fiberglass Smith Fiberglass <br /> Piping Diameter: 2" 2" <br /> Length of Piping Ron: 55' 50' <br /> Product Stored: Unleaded Diesel <br /> Method and location of From Soup to Dispenser From Sump to Dispenser <br /> i in -mn isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: Not Testable 30 Min <br /> Test Start Time: 10:00 <br /> Initial Reading(Rr): 5 psi <br /> Test End Time: 11:00 <br /> Final Reading(Rr): 5 psi <br /> Test Duration: I Hr <br /> Change in Reading(R,-RI): 0 <br /> Pass/Fail Threshold or <br /> Criteria I psi Loss 1 psi Loss I psi Loss I psi Loss <br /> : <br /> Test Result: I ❑ Pass ❑✓ Fail ❑✓ Pass❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs madeprior to testing and recommended ollow-upforfailed tests) <br /> Secondary pipe test on#1 (SPT#1) untestable,Test boots are on.Not holding pressure. Not enough room <br /> to make repairs.Dispenser needs to be removed in order to make repairs. <br /> Recommendation: Needs new test boots installed and retested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.