Laserfiche WebLink
1 —Od-202 8.27AM FROM SACRAMENTO EMC 9169252816 p_ 4 <br /> , zamento Equipment Maistteimncc Company,lr,e Work Order 106605 <br /> Site Address; PGE094-Stockton Service Center Date of Testing/Servicing: 11/01/01 <br /> 4040 West Lane-Stockton <br /> F. In-Tank Gauging/SIR Equipment Check this box if tank ganging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Yea No Complete the following checklist: <br /> Has all input wiring been utspe^cted for proper entry and termination,including testing for ground faults? <br /> Were all trunk gauging probes visually inspected for damage and residue buildup? <br /> Was accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturers's maintenance checklist completed? <br /> .. , <br /> 7Abo"va trammed boxesteed to dcsat7ba;•io>xr,attd When tiro e d EtCitstras'+a W�crv4 be conte T14:9 tion H brlgf�) <br /> G. Line Leak Detectors(LLD): ./ Check this box if LLDs are not installed. <br /> Yes Na NIA Complete the following checklist: <br /> For uiphent start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> (Check all that apply) <br /> Simulated Leak rate: 3 g.p.h.`; 4.1 g.p.h.x <br /> 0.2 g.p.h.' <br /> Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Was the testing apparatus properly calibrated? <br /> For mechanical LLI?s,does the LLD restrict product flow if it detects a reale? <br /> For electronic LLDs,docs the turbine automatically shat off if the LLD detects a le&V <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> disconnected? <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a <br /> test? <br /> For electronic LLDs,have all accessible wiring connexions been visually inspected? <br /> Were all item on the equipment manufacturer's maintenance checklist completed? <br /> (,Above sbaded;l ikl es need to describe°how and;:when in se 110ti H belpw) <br /> H. Comments: <br /> 113/01 county/0000E/mtatd3-monitoringrert.wrd page 3 of 4 <br />