My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2002 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:04:48 PM
Creation date
11/7/2018 10:05:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2004
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\COMPLIANCE INFO 2002 - 2004 .PDF
QuestysFileName
COMPLIANCE INFO 2002 - 2004
QuestysRecordDate
7/26/2018 10:41:38 PM
QuestysRecordID
3948516
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 —Od-202 8.27AM FROM SACRAMENTO EMC 9169252816 p_ 4 <br /> , zamento Equipment Maistteimncc Company,lr,e Work Order 106605 <br /> Site Address; PGE094-Stockton Service Center Date of Testing/Servicing: 11/01/01 <br /> 4040 West Lane-Stockton <br /> F. In-Tank Gauging/SIR Equipment Check this box if tank ganging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Yea No Complete the following checklist: <br /> Has all input wiring been utspe^cted for proper entry and termination,including testing for ground faults? <br /> Were all trunk gauging probes visually inspected for damage and residue buildup? <br /> Was accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturers's maintenance checklist completed? <br /> .. , <br /> 7Abo"va trammed boxesteed to dcsat7ba;•io>xr,attd When tiro e d EtCitstras'+a W�crv4 be conte T14:9 tion H brlgf�) <br /> G. Line Leak Detectors(LLD): ./ Check this box if LLDs are not installed. <br /> Yes Na NIA Complete the following checklist: <br /> For uiphent start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> (Check all that apply) <br /> Simulated Leak rate: 3 g.p.h.`; 4.1 g.p.h.x <br /> 0.2 g.p.h.' <br /> Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Was the testing apparatus properly calibrated? <br /> For mechanical LLI?s,does the LLD restrict product flow if it detects a reale? <br /> For electronic LLDs,docs the turbine automatically shat off if the LLD detects a le&V <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> disconnected? <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a <br /> test? <br /> For electronic LLDs,have all accessible wiring connexions been visually inspected? <br /> Were all item on the equipment manufacturer's maintenance checklist completed? <br /> (,Above sbaded;l ikl es need to describe°how and;:when in se 110ti H belpw) <br /> H. Comments: <br /> 113/01 county/0000E/mtatd3-monitoringrert.wrd page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.