My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2002 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:04:48 PM
Creation date
11/7/2018 10:05:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2004
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\COMPLIANCE INFO 2002 - 2004 .PDF
QuestysFileName
COMPLIANCE INFO 2002 - 2004
QuestysRecordDate
7/26/2018 10:41:38 PM
QuestysRecordID
3948516
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging l SIR Equipment: �Check this box if tank gauging is used only for inventory control <br /> 11 Check this box if no tank gauging or SIR equipment is installed. <br /> flus section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> A Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: g3 g.p.h.; ❑ 0,1 g.p.h ; ❑ 0.2 g.p.h. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> I Yes © No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> Yes J No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.