Laserfiche WebLink
• F. In-Tank Gauging I SIR Equipment: ❑ Check this box if tank gauging is used only for inventory c�dntrol <br /> 'W-Check this box if no tank gauging or SIR equipment is installed: <br /> Tl1is section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the following checklist: <br /> ❑ Yes ❑ No* I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Cl Yes ❑ No* Were all tank.gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ .No* Was accuracy of system product level readings tested? Z. <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): Clieck this box if LLDs are not installed. <br /> Com lete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Check all that apply) Simulated leak rate: ❑3 g.p.h.; ❑ 0.1 g.p.h ; Ll 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> I Yes ❑ -No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 13 N/A or disconnected? <br /> ❑ Yes Cl No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03I0] <br />