Laserfiche WebLink
0 0 <br /> 10. Contain the release IF IT CAN BE DONE SAFELY by using one of the following <br /> containment techniques: <br /> a. For relatively small spills, apply absorbent to the surface of the oil <br /> and reapply until there is enough to absorb all the liquid. <br /> b. For larger spills, construct earthen dikes or ditches around the spill <br /> to prevent the discharge from flowing off-site or into waterways. <br /> c. Prevent discharge into stormdrains by sealing off with plastic and/or <br /> earthen dikes. <br /> d. If the discharge has or is likely to reach a waterway, call for the <br /> assistance of a cleanup firm which is listed in Section 4E, who can <br /> deploy booms, sorbant booms, or underflow dams. <br /> 11 . If the spill occurs on a public road or highway, notify: <br /> California Highway Patrol (CHP) , Sacramento <br /> 24-hour number is Zenith 1-2000 (place all through operator) . <br /> NOTE TIME CALL IS MADE. <br /> 12. If the spill threatens facility personnel , notify personnel for <br /> evacuation. <br /> 13. If after actions were taken to contain and cleanup the spill , it still <br /> poses either a present or potential threat to the health and safety of <br /> people inside or outside the facility property, or to property or the <br /> environment, notify the California Office of Services (OES) and local <br /> emergency response organizations and provide the following information: <br /> a. Date, time, and exact location of the release or threatened release. <br /> b. Name and telephone number of person reporting the spill . <br /> c. The type of hazardous materials involved, if known, in the release or <br /> threatened release. <br /> d. The estimated quantity of released material and/or quantity of <br /> material involved in a threatened release. <br /> e. A description of the potential hazards, if known, presented by the <br /> hazardous material involved in the release or threatened release. <br /> Document the time and date notification is made and information provided. <br /> 14. Check if the material spilled has a Reportable Quantity (RQ) requirement. <br /> (Refer to Section 3 of this plan or Appendix F of PGandE's Hazardous Waste <br /> Manual . ) <br /> 5-20 <br />