Laserfiche WebLink
Operating Electrical There is a transformer bank containing three <br /> Equipment: aboveground transformers and regulators for 60kv <br /> to 12kv local distribution. The total volume of <br /> oil in this equipment is 13,473 gallons. <br /> There is also an operating step-down transformer <br /> in the southwest corner of the yard that is used <br /> to furnish power to this facility and it contains <br /> 265 gallons of oil. <br /> Fuel Islands: Pumps for the underground tanks containing motor <br /> vehicle fuel are located at the unleaded fuel <br /> island, south of the Auto Repair Shop and the <br /> diesel fuel island, east of the Auto Repair Shop. <br /> Fence: The entire yard is surrounded by a chain link <br /> fence topped with barbed wire. There are three <br /> entrance gates to the facility. <br /> H. Operating Schedule: <br /> The facility is manned 24 hours per day, seven days per week. During <br /> regular working hours (7:30 a.m. to 4:30 p.m. ) , approximately 123 <br /> employees are at the facility. <br /> During evenings, the facility is manned by 10 employees. During weekends, <br /> the facility is manned by 1 employee. <br /> There is at least 1 supervisor on call per shift. <br /> The Facility Emergency Coordinator and alternates are on call 24 hours per <br /> day. <br /> 2-4 <br />