Laserfiche WebLink
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 14 - Electrical Work <br /> 14 . 3 . 1 Pay all inspection and other applicable fees and obtain <br /> all licenses and permits necessary to execute the work <br /> of this section. <br /> 14 . 4 Forming , Cutting and Patching <br /> 14 . 4 . 1 Contractor will provide any special forming , recesses , <br /> chases , etc . , and provide wood blocking , backing and <br /> grounds as necessary for the proper installation of <br /> electrical work . Be responsible for notifying <br /> Contractor that such provision is necessary and lay out <br /> work and check it to see that it suits requirements for <br /> work herein . <br /> 14. 4. 2 If trade responsible fails to notify Contractor at <br /> proper time , or fails to locate items properly , <br /> resulting in extra work, said trade shall be responsible <br /> and shall reimburse the Contractor for extra costs <br /> involved . <br /> 14. 4. 3 Be responsible for proper placements of pipe sleeves , <br /> hangers , inserts and supports for this work. <br /> 14. 5 Tests : <br /> 14. 5 . 1 Test all wiring and connections for continuity and <br /> grounds ; where such tests indicate faulty insulation or <br /> other defects , locate , repair and retest . Balance loads <br /> at panelboards . Check rotation of all motors and <br /> correct if necessary . Furnish all testing equipment . <br /> 14. 6 Products and Execution : <br /> 14 . 6 . 1 General : Examine all drawings , specifications , and the <br /> site , be familiar with requirements of work , furnish and <br /> install all electrical work indicated or specified . <br /> Install all equipment and material in a workmanlike <br /> manner in accordance with NECA Standard of Installation . <br /> 14 . 6 . 2 Work shall b;,e coordinated with other crafts to avoid <br /> conflicts and all outlet locations checked against other <br /> work to be installed . Minor adjustments made necessary <br /> by other work shall be made as approved by Engineer at <br /> no additional cost . Work shall be furnished and <br /> installed at proper time to avoid delay in work. <br /> XIV-2 <br />