My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 14 - Electrical Work <br /> 14 . 3 . 1 Pay all inspection and other applicable fees and obtain <br /> all licenses and permits necessary to execute the work <br /> of this section. <br /> 14 . 4 Forming , Cutting and Patching <br /> 14 . 4 . 1 Contractor will provide any special forming , recesses , <br /> chases , etc . , and provide wood blocking , backing and <br /> grounds as necessary for the proper installation of <br /> electrical work . Be responsible for notifying <br /> Contractor that such provision is necessary and lay out <br /> work and check it to see that it suits requirements for <br /> work herein . <br /> 14. 4. 2 If trade responsible fails to notify Contractor at <br /> proper time , or fails to locate items properly , <br /> resulting in extra work, said trade shall be responsible <br /> and shall reimburse the Contractor for extra costs <br /> involved . <br /> 14. 4. 3 Be responsible for proper placements of pipe sleeves , <br /> hangers , inserts and supports for this work. <br /> 14. 5 Tests : <br /> 14. 5 . 1 Test all wiring and connections for continuity and <br /> grounds ; where such tests indicate faulty insulation or <br /> other defects , locate , repair and retest . Balance loads <br /> at panelboards . Check rotation of all motors and <br /> correct if necessary . Furnish all testing equipment . <br /> 14. 6 Products and Execution : <br /> 14 . 6 . 1 General : Examine all drawings , specifications , and the <br /> site , be familiar with requirements of work , furnish and <br /> install all electrical work indicated or specified . <br /> Install all equipment and material in a workmanlike <br /> manner in accordance with NECA Standard of Installation . <br /> 14 . 6 . 2 Work shall b;,e coordinated with other crafts to avoid <br /> conflicts and all outlet locations checked against other <br /> work to be installed . Minor adjustments made necessary <br /> by other work shall be made as approved by Engineer at <br /> no additional cost . Work shall be furnished and <br /> installed at proper time to avoid delay in work. <br /> XIV-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.