My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIL_ GC3.1 Construction Nediun For) General Conaltlons 3-3-33 3CS Genera: Conditions ry-, <br /> '.; (Rtgelder - Insur l GC-i <br /> • GENERAL CONDITIONS <br /> 1 DEFINITIONS <br /> 1.1 '?CAE": Pscifi. Gas and Electric Compal. <br /> 1.2 "Bidder": Parry or parties submitting a proposal for the specified work. <br /> 1.3 "Constructor": PGSE's Vice President-General Construction or his authorized representative. <br /> 1.4 'Materials Department": PG&E's `tanager of Materials Department or his authorized representative. <br /> . .��••�'�,.4, i, N '•S.T S'.r, <br /> 'EogSneer : PG&E s Vice President-Engineering or his authorized representative. <br /> 1.6 "Contractor": Party or parties entering into a contract with PC&E for the work. <br /> 1.7 "Contract": This agreement, between Fr&E and Contractor for the work under the Specification. <br /> 1.8 "Specification": ME's Specification which Includes these General Conditions, the Specific Conditions, and <br /> ocher documents specified under the Contents page -L-. <br /> 1.9 "As Directed." "As Required," "As Permitted." "approved," "acceptable." "Satisfactory," or similar terms <br /> shall mean by or to Constructor. <br /> 1.10 "Work": Labor, materials. and requirements specified. <br /> 1.11 "Approved Equivalent": An item approved by Engineer as being acceptable to PG&E as a substitute for a <br /> specified item. Additionai substitution requirements are specified in Division 1. <br /> 2 PROPOSALS <br /> 2.1 GENERAL: Proposal shall he submitted on the attached Proposal Cora, enclosed in a sealed envelope marked <br /> "Proposal" with the title of the work, and delivered to the address stated In the Proposal Form on or prior to <br /> the time invited. The signed Specification and drawings Shall be forwarded with the Proposal. PG&E reserves the <br /> right to refect any or all proposals. <br /> 2.2 VISIT TO WORK SITE. Bidder shall make arrangements with Constructor to visit the work site. The Proposal <br /> shall be based on full knowledge of all conditions that would affect the cost and conduct of the work. <br /> 2.3 TL`ME: Contractor shall perform the work In as short a time as practicable consistent with good workmanship <br /> and without overtime, unless otherwise specified. Time quoted by Bidder for completion of the work will be an <br /> laportant consideration in making the award of contract. The time so stated will be incorporated In the <br /> contract. Time is of the essence. <br /> 3 DRAsII[CS. SP_CIFICATION AND INFORMATION <br /> 3.1 DISCREPPA:ICIES: Specification and drawings are complementary and are intended to be consistent with each <br /> other. Contractor shall report to Constructor any discrepancies or errors. <br /> 3.2 DLMZ NSIONS: Contractor shall obtain at the work site the necessary dimensions and not rely on the drawings <br /> for dimensions which tic into the existing work. No claim will be honored which is a result of failure to comply <br /> with this provision. 9b <br /> 3.3 CONSTRUCTICN DRAWINGS: As soon as possible after award oL contract, approved construction drawings will be <br /> provided Contractor for use in the performance of the work. Bidding drawings shall not be used for construction <br /> purposes unless authorized in writing by Constructor. <br /> 3.4 ESTIMATED QUANTITIES. WEIGHTS. OR DATA: Quantities, weights, or data made available to Contractor by PG&E <br /> for preparation of his proposal or for performance of the work shall not relieve Bidder or Contractor of the <br /> responsibility to satisfy himself through investigations as to conditions affecting the cost and performance of <br /> the work. Estimated quantities and information submitted are the beat available at the time, however. PG&E <br /> assumes no responsibility for the correctness of such information or for Contractor's conclusions drawn <br /> therefrom, <br /> F11.ECM/105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.