My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fILE CMI Construction Nedium Form) General Conditions 5-3-83 BCS General Conditions (`SF) <br /> WReider - Insurance) CC-4 <br /> 12 DELAYS AND SUSPENSION OF WORK <br /> 12.1 SUSPENSION OF ;.CRK: Constructor may suspend the writ or delivery of materials for causes he considers to <br /> be sufficient. <br /> 12.2 DELIVERY OF 'L17ERIALS: Delivery dates for materials to be supplied by others directly or through ?CSE have <br /> been scheduled to allow Contractor sufficient tLme for Installation In compLlance with the specified construction <br /> schedule. <br /> 12.3 NOTZM AT;ON: Contractor shall notify Constructor promptly in writing upon knowied3e of any impending <br /> cause for delay and PCaE wlli use Its best efforts to prevent the dalay. Failure to notify Constructor shall <br /> Constitute waiver by Contractor of concessions or benefits specified under this Paragraph. <br /> 12.4 DELAYS WITHtl CONTRACTOR'S CONTROL: No additional compensation or other concessions will be aLLowed <br /> Contractor for expenses incurred as a result of delays arising from causes for which Contractor is responslbLe. <br /> If. Ln Constructor's opinion, a delay that is sufficient to prevent Contractor's compliance with the specified <br /> construction schedule. Contractor shall be required to accelerate the work through overtime or other means, at <br /> his expense, to allow for compietlon on schedule. <br /> 12.3 DELAYS BEYOND C0'r RaCTOR'S CONTROL: In the event of a delay in delivery of material to he furnished by or <br /> through PG&E or a delay that is, Ln Caastruc,or's opinion, caused by circurntances beyond Contractor's control. <br /> except delays due to inclement weather. Constructor will investigate the causes and remedies and may require or <br /> authorize aay of the following ,procedures. Contractor will be promptly notified as to which procedure shall be <br /> followed: <br /> 12.5.1 If, in Constructor's opinion, the current progress of the w rk Is satisfactory and the delay is <br /> minor, Contractor may be required to complete the work in accordance wLth the specified construction <br /> schedule +.rich no allowance for extra time or extra crospensation. <br /> 12.5.2 If, in Constructor's opinion, any actual delav is sufficient to prevent Contractor's compliance with <br /> the specified construction schedule. Constructor will require or authorize any of the following procedures, <br /> 12.5.2.1 Extend the specified completion dace, with no extra compensation, for a period of tire equal <br /> to the delay plus. in the event of strikes or other causes that Take It necessary to close down the <br /> work, an additional two days. <br /> 12.5.2.2 Authorize overtime as necessary to eeoply wLth the specified completion date. PCec will only <br /> reieburse Contractor for the premium portion of overtime. No other extra compensation will be al Lowed. <br /> 12.5.2.3 Extend the specified completion date and authorise certain overtime as directed. <br /> Compensation for overtime will be as set forth under the Paragraph 12.5.2.2. <br /> 40 <br /> fie <br />
The URL can be used to link to this page
Your browser does not support the video tag.