Laserfiche WebLink
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 2 - Summary of The <br /> Work <br /> SECTION 2 - SUMMARY OF THE WORK <br /> 2 . 0 General Information <br /> This section generally describes the scope and nature of the <br /> proposed work. <br /> 2 . 1 Related Documents <br /> Project plans and general conditions of the Pacific Gas and <br /> Electric Company apply to work of this section. <br /> 2 . 2 Project Identification <br /> 2 . 2 . 1 General : The project name is Transformer Oil Tank <br /> Installation , Stockton Service Center , Stockton , <br /> California , as described in the contract documents <br /> prepared by the Twining Laboratories , Inc . Drawings and <br /> specifications are dated February 6 , 1487 . <br /> 2 . 2. 2 Contract Documents : The contract documents comprise five <br /> separate bid items . They are : <br /> - Installation of a new 2 , 000 gallon double -walled , <br /> fiberglass clad , steel transformer oil tank with <br /> appurtenant equipment and piping . <br /> - Installation of a concrete contained steel sump . <br /> - Precision leak test tank system. <br /> - Installation of concrete slabs under and over tank. <br /> - Installation of asphalt concrete paving . <br /> 2 . 3 Summary Description of the Work <br /> Without force and effect upon the specific conditions and <br /> the contract documents the work of the contract is briefly <br /> summarized as follows : <br /> 2 . 3 . 1 Saw cut and remove asphalt concrete as necessary for the <br /> new tank and sump excavations . <br /> 2 . 3 . 2 Install a concrete contained steel sump as shown on the <br /> project plans . <br /> 2 . 3 . 3 Install a 2 , 000 gallon double-walled , fiberglass clad <br /> steel tank. <br /> 2 . 3 . 4 Install piping and appurtenant equipment . <br /> II-1 <br />