My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 2 - Summary of The <br /> Work <br /> 2 . 3 . 5 Install reinforced concrete slab under and over the new <br /> tank as indicated on the project plans and match existing <br /> grades . <br /> 2 . 3 . 6 Furnish and install all plumbing and electrical <br /> connections needed to operate the above equipment , perform <br /> all trenching and pavement patching necessary to perform <br /> the work. <br /> 2 . 3. 7 Precision leak test tank system and make any necessary <br /> repairs . Perform additional precision leak tests on tank <br /> system as necessary until tank system meets required <br /> standards . <br /> 2 . 3 . 8 Install asphalt concrete paving as necessary . <br /> 2 . 3 . 9 Prepare record drawings and specifications for the work <br /> upon completion. <br /> 2 . 4 Work Schedule : Contractor shall commence work upon <br /> authorization to proceed by PG&E . <br /> 2 . 5 Contractor Use of Premises <br /> 2 . 5 . 1 General : The Contractor shall limit his use of the <br /> premises to the work indicated , so as to allow for P . G . & <br /> E . occupancy and use by the public . <br /> 2 . 5 . 2 Full P . G . & E . Occupancy : P .G. & E . will occupy the site <br /> and the existing building during the entire period of <br /> construction . The Contractor shall cooperate fully with ` <br /> P . G . & E . or his representative during construction <br /> operations to minimize conflicts and to facilitate P .G . & <br /> E . usage . The Contractor shall Perform the work so as not <br /> to interfere with P .G . & E . ' s operations . <br /> 2 . 6 P .G . & E . Responsibilities : <br /> 2 . 6 . 1 Provide site access and approvals necessary under the <br /> contract provisions . <br /> lI-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.