My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 10 - Earthwork <br /> the side of the building below a line sloping down and <br /> away at a 2 : 1 (horizontal to vertical ) slope from the <br /> bottom outside edge of all footings . Do not backfill <br /> trenches until tests and inspection have been made and <br /> backfilling authorized by Engineer . Use care in <br /> backfilling to avoid damage or displacement of pipe <br /> systems . <br /> 10 . 6 . 3 Compaction: <br /> 10 . 6 . 3 . 1 General : Control soil compaction during construction <br /> providing minimum percentage of density specified for <br /> each area classification. <br /> 10 . 6 . 3 . 2 Percentage of Maximum Density Requirements : Compact <br /> soil to not less than the following percentages of <br /> maximum dry density for soils which exhibit a well <br /> defined moisture density relationship determined in <br /> accordance with ASTM D1557 -78 ; and not less than the <br /> following percentages of relative density , determined <br /> in accordance with ASTM D2049 , for soils which will <br /> not exhibit a well defined moisture density <br /> relationship . <br /> 10 . 6 . 3 . 2 . 1 . Structures : Compact subgrade and each layer of <br /> backfill or fill material at 95 % relative dry <br /> density . <br /> 10 . 6 . 3 . 2 . 2 Building Slabs : Compact subgrade and each layer of <br /> backfill or fill materials at 95 % maximum dry <br /> density . <br /> 10 . 6 . 3 . 3 Moisture Control : Where subgrade or layer of soil <br /> material must be moisture conditioned before <br /> compaction , uniformly apply water to surface of <br /> subgrade , or layer of soil material , to prevent free <br /> water appearing on surface during or subsequent to <br /> compaction operations . Remove and replace , or scarify <br /> and air dry , all material that is too wet to permit <br /> compaction to specified density . Soil material that <br /> has been removed because it is too wet to permit <br /> compaction may be stockpiled or spread and allowed to <br /> dry . Assist drying by discing , harrowing or <br /> pulverizing until moisture content is reduced to a <br /> satisfactory value . <br /> • X-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.