My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 10 - Earthwork <br /> 10 . 6 . 4 Backfill and Fill : <br /> 11 . 6 . 4. 1 General : Place acceptable soil material in layers to <br /> required subgrade elevations . <br /> 10 . 6 . 4. 2 Backfill excavations as promptly as work permits , but <br /> not until completion of the following : <br /> Acceptance of construction below finished grade . <br /> Inspection , testing , approval and recording locations <br /> of underground utilities . <br /> Removal of concrete framework. <br /> Removal of trash and debris . <br /> 10 . 6 . 4 . 3 Ground Surface Preparation : Remove vegetation , <br /> debris , unsatisfactory soil materials , obstructions , <br /> and deleterious materials from ground surface prior to <br /> placement of fills . Plow , strip , or break-up sloped <br /> surfaces steeper than 1 vertical to 4 horizontal so <br /> that fill material will bond with existing surface . <br /> When existing ground surface has a density less than <br /> that specified under "Compaction" for particular area <br /> classification , break up ground surface , pulverize , <br /> moisture- condition to optimum moisture content , and <br /> compact to required depth and percentage of maximum <br /> density. <br /> 10 . 6 . 4 . 4 Placement and Compaction : Place backfill and fill <br /> materials in layers not more than 8 " in loose depth <br /> for material compacted by heavy compaction equipment , <br /> and not more than 4 " in loose depth for material <br /> compacted by hand - operated tampers . Before <br /> compaction, moisture or aerate each layer as necessary <br /> to provide optimum moisture content . Compact each <br /> layer to required percentage of maximum dry density or <br /> relative dry density for each area classification . <br /> Place backfill and fill materials evenly adjacent to <br /> structures , to required elevations . Take care to <br /> prevent wedging action or backfill against structures <br /> by carrying material uniformly around structure to <br /> approximately safe elevation in each lift . <br /> X-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.