Laserfiche WebLink
itions.In ho <br /> Bonding primary The table indicates the adhesive pot life 1-11111:311916us tempa�Qnde the Bonn of m zedt <br /> systems (Cont.) weather,pot life may be extended by wrapping a damp rag <br /> adhesive or by spreading the adhesive on aluminum foil to dissipate the heat. �r <br /> Pot life/cure times for Ameron B20 adhesive <br /> Minimum Ambient Adhesive Minimum Joint <br /> Temperature Pot Life Cure Time' <br /> (minutes) (hours) <br /> 40 5 70 12 <br /> 65 18 40 5 <br /> 75 24 30 4 <br /> 95 35 20 3 <br /> Cumulative totals.Cure time at listed temperatures need not he <br /> uninterrupted,but total time must equal the tabulated time before <br /> the system is pressure tested. <br /> Force curing adhesive <br /> r—1 At temperatures below 40°F(5°C)or if the temperature will not be above 40°F(5°C) <br /> Temperatures may be lower during the entire period of cure,an external heat source must be used to force cure the <br /> than ambient in a trench or adhesive.The adhesive and the bonding surfaces should be warmed to 50°F(10°C) <br /> out of direct sunlight. before mixing and applying the adhesive. <br /> -- —� <br /> L--- <br /> ——!'— Below 40°F(5°C)farce cure the adhesive with an external heat source such as: <br /> • Chem Cure Pak(US Pat.No.3,475,239) <br /> • Ameron heating blanket sufficiently large to cover the joint <br /> • Forced air heater if the trench is covered to contain the heat <br /> • Hot air gun <br /> Using Chem Cure Pak with Ameron B20 adhesive <br /> The Chem Cure Pak is a self-contained,nonelectrical heat source for curing adhesive- <br /> bonded joints.Instructions are printed on the Pak wrapper.The Pak is designed so that <br /> sufficient heat'is generated to cure Ameron B20 adhesive in one hour at ambient <br /> temperatures as low as 0°F(-18'C).The Chem Cure Pak is manufactured in different <br /> sizes corresponding to the diameter of the piping being installed.Use the correct size <br /> Pak for your installation.Refer to table on page 11 when ordering. <br /> In cold weather,wrap insulation around the Pak as soon as it has stopped steaming. <br /> For lower temperatures or when installing extra-heavy fittings,consult Ameron for <br /> —————– specific recommendations. <br /> Chem Cure Pak contains oxalic Assemble pipe and fittings using standard field installation procedures. <br /> acid.Harmful if swallowed.Causes 0 Mix the chemicals thoroughly as directed on the Pak wrapper- <br /> skin and eye irritation. E • Wrap the Pak around the connections,centering it over the tapered section of <br /> L————————————J the joint,not over the end of the fitting.Cover the entire bonding area to which <br /> adhesive has been applied.Refer to Fig.7-1. <br /> • Use one Pak per bond:sleeve couplings in 3-inch sizes and larger require two <br /> Activator <br /> Paks.However,a single Pak is sufficient for curing both bonds in a 2-inch sleeve <br /> 1-in slot <br /> syringe Coupling. <br /> • Secure the Pak with tie wires. <br /> • Cut slits at least 1 inch wide(25 mm)on either side of the Pak. <br /> • Inject water into the slits with the activator syringe or pour in a small amount from <br /> +� a cup. <br /> Tie wiresCenter Pak over Aluminum fait may be wrapped directly over the joint to prevent the Pak from <br /> tapered area sticking if it is necessary that the expended Pak be removed from the trench. <br /> Fig.7-1.The Chem Cure Pak should Follow the precautions printed on the Chem Cure Pak wrapper: <br /> produce steam in about 30 seconds atter Do not get ingredients on skin,in eyes,or on clothing. <br /> injecting water.ffno reaction occurs, Do not breathe dust or vapor. <br /> discard the Pak and use anotherone. <br /> • Use only outdoors where adequate ventilation is provided. <br /> • Qo not take internally. <br /> • Keep out of reach of children. <br /> 10 <br />