Laserfiche WebLink
.ddmlkk all, <br /> Bonding primary Using heating biankets <br /> systems (cont.) Ameron heating blankets provide an efficient means for curing adhesive-bonded joints. <br /> Two sizes are needed for installing <br /> Dualoy 3000/Lsystems.Refer to Chem Cure Pak quantities and heating <br /> following table when ordering. <br /> blanket sizes <br /> Nominal Chem Heating <br /> The heating blanket reaches a Pipe Size Cure Pak Blanket <br /> maximum temperature of 300T (in (mm) Units per Carton size <br /> (1 50°C),which will cure Ameron B20 2 50 30 1 <br /> adhesive in approximately 30 to 40 3 80 30 1 <br /> minutes.Detailed instructions are 4 100 20 1 <br /> included with the blanket.Observe the 6 150 20 11 <br /> following points: <br /> • Use one heating blanket per bond:sleeve couplings in 3-inch sizes and larger <br /> will require two blankets.However,a single blanket is sufficient for curing bath <br /> bonds in a 2-inch sleeve coupling. <br /> • Tie the blanket in place with nonconducting ties. <br /> • Before connecting to a power source,inspect the blanket and cord for loose wire <br /> connections and bare wires. <br /> • Do not plug the cord into a power source when standing in water or on a wet <br /> surface. <br /> • Check that the heating blanket has the correct AC voltage rating for your locality. <br /> Do not use direct current. <br /> • Mark the starting and disconnect time on the pipe with a grease pencil so that <br /> you will have a record of cure for each joint. <br /> • Verify that the blanket actually heats up after being plugged in. <br /> • Do not move or disturb the joint during cure. <br /> Blanket <br /> Fitting <br /> I <br /> I <br /> Fig. 7-2.Place the thermostat <br /> end of the blanket against the <br /> t. <br /> joint with thermostat facing ou <br /> Wrap the rest of the blanket <br /> around the joint so that the <br /> overlap covers the thermostat. <br /> Thermostat <br /> Fig. 7-3.When it is windy or below Fiberglass insulation backed by 4 <br /> 50°F(10°C),close the pipe ends and aluminum icil <br /> insulate around the blanket.Overlap <br /> the blanket about 4 inches on each <br /> side and tie down the ends of the <br /> insulation. <br /> h <br /> r <br /> Connecting to non-Ameron fiberglass piping <br /> Connect Dualoy 3000/L fiberglass piping and non-Ameron UL-listed fiberglass piping <br /> by means of threaded adapters.Do not adhesive bond Ameron piping to that of <br /> another manufacturer.Bond the appropriate adapter from each manufacturer to the <br /> manufacturer's pipe using that manufacturer's adhesive.Complete the threaded <br /> connection using thread sealant„not pipe adhesive.By following this procedure you <br /> can use Dualoy 30001L piping to extend an existing line that employs the pipe from <br /> another manufacturer without voiding the UL listing of either system. <br /> 11 <br />