My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
2300 - Underground Storage Tank Program
>
PR0231304
>
INSTALL_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:00:36 PM
Creation date
11/7/2018 11:24:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1986
RECORD_ID
PR0231304
PE
2332
FACILITY_ID
FA0003694
FACILITY_NAME
RIVER CITY PETROLEUM CARDLOCK
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\2211\PR0231304\INSTALL 1986.PDF
QuestysFileName
INSTALL 1986
QuestysRecordDate
8/10/2017 9:55:11 PM
QuestysRecordID
3569860
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installing Combo & Petro Cables Nylon Cord ad;al <br /> Cable <br /> Radial Cables—At the monitoring fitting of the -cap <br /> tank attach one end of the nylon cord to the small <br /> male plug of the Radial Cable. Carefully pull the p <br /> cable into and around the tank's interstitial <br /> space. Once the loop has been completed con- <br /> nect the Radial Cable to the Connector Cable or ! <br /> the Monitor Cable and carefully push the excess <br /> cable into the cross fitting, then screw on the Conduit-,� <br /> cap. (Illustration 5 & 7) <br /> 41 <br /> li <br /> 11 <br /> u Cross Fitting <br /> u <br /> d <br /> Tank <br /> Male Plug End <br /> t <br /> nylon Card <br /> Illustration 5 <br /> Vertical Cables—Lower the Vertical Cable straight down into the monitoring station until it reaches <br /> the bottom. Connect the Vertical Cable to the Connector or Monitor Cables. Carefully push excess <br /> cable into the cross fitting, then screw on the cap. (Illustration 6 & 7) <br /> Condu,t. Conduit <br /> Crass rifting Cap . <br /> r� <br /> Vertical Combo Cable <br /> steel Rouble 'fall Tank �j I' <br /> Jacketed Steel Tank <br /> Connector or + <br /> .`1 coni for CabSc <br /> Conduit <br /> Connector Cable ` <br /> Cross Fitting <br /> Combo or Petro Cable <br /> Illustration 6 Illustration 7 <br /> —11— <br />
The URL can be used to link to this page
Your browser does not support the video tag.