Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN—(Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC)MONITORING tCheck all <br /> thatapply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® L CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> 40-46. <br /> ❑ 4.NO DISPENSERS El99.OTHER(Specify) <br /> LEAK MONITOR MANUFACTURER:Veeder-Root 490-55" MODEL N:TLS-3S0 4490-56. <br /> 490.57. 490-58. <br /> LEAK SENSOR MANUFACTURER: Veedel' 208 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-59' <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a YES ❑ b.NO 49050. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-MI. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ® b.NO 49062" <br /> UDC CONSTRUCTION IS: ® I.SINGLE WALL ❑ 2.DOUBLE WALL 4S0.63. <br /> 490fi , <br /> IF DOUBLE WALL: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a-YES ❑ b.NO 490546. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4905-. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD 1S PERFORMED EVERY 36 MONTHS AS REQUIRED.I23 CCR§2644,11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 090"67 <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 49065. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities we Familiar wid]all of the following documents relevant to thenjob duties: 49059.. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY❑(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490.596. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 49009.. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49069d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49o-59r <br /> STATISTICAL INVENTORY RECONCILIATION" 490-69e <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br /> 490 69h. <br /> ❑ OTHER(Specify): 49 <br /> ® This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council 49070. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of him.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 49071" <br /> Overfill95%mechanical flapper <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator isresponsible For ensuring that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2, all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME Paul Chevalier 490-]2TITLE:Maintenance Manager/Designated Operator 490-73. <br /> NAME Nu-Gina Rogers 490-'4 TITLE:Area Re resentative 490-s. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/0jffj§r of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE —ter=u- <br /> CERTIFICATION:I certify that the information rovided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-]]. <br /> Sep. 25, 2012 <br /> REPRESIE I G:01.Tank erl tor P97.Facilii O erl0 erator 1.AmM1arizedR msema5ve of Owner 490-]6. <br /> APPLICANT NAME(print): 490-76. APPLICANT TITLE: 490-9. <br /> Paul Chevalier Maintenance Manager <br /> UPCF UST-D(122007)-3/4 www.unidoes.org <br />