My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
BILLING 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:34:31 AM
Creation date
11/7/2018 12:01:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2012-2015
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1434\PR0231465\BILLING 2012-2015.PDF
QuestysFileName
BILLING 2012-2015
QuestysRecordDate
6/26/2017 3:07:01 PM
QuestysRecordID
3465007
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATEDTORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 1 of N <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 45q-1. <br /> PLAN TYPE ® L MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. - - 490.2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) , <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> Tower Mart#886 <br /> BUSINESS SITE ADDRESS 1434 W Yosemite Ave. 103. CITY Manteca ,CA 95337 104 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> _ the equipment manufacturers'instructions,or annually,whichever is more Ire uq ent.Such work must be ep rformed by qualified personnel.[z3 cCR y2e32,2534,zaas,2e411 <br /> MONITORING EQUIPMENT IS SERVICED El I.ANNUALLY ❑ 99.OTHER(Specify): 0o-3'' <br /> 4903b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) rha Qka' <br /> ,] I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAUCF(S) 4905. <br /> WITH AUDIBLE AND VISUAL ALARMS.[D c R§2532,w341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FELLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 4906. <br /> PANEL MANUFACTURER: Veeder-Root 490-7" MODEL#: TLS 350 490-5, <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9' MODEL#(S):794390-420 490.10, <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SBJGLE WALL TANK(SI.[23 CCR 126431 490.11. <br /> PANF.L.MANUFACTURER 490.12' MODEL 0: 490.0. <br /> IN-TANK PROBE MANUFACTURER: 090.14 MODEL#(S): 49015. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49x-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 40.17. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 h. 490-18. <br /> _ g.p. ❑ c.OTHER(Specify): 49x19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR g2e46.11 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)ID CcR§2645) TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> D °90.31. <br /> ❑ 5.TANK INTEGRITY TESTING PER Icm g2643.0 09490.23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490'24' <br /> ❑ 99.OTHER(Specify): "--25 <br /> 490-2]. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS MONITORING OF PIPE/P[PING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 0,90.28. <br /> §M'6I SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder-Root 490-30 MODEL#: TLS 350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490.32. MODEL# 0794380-208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-14. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490,35. <br /> 2.MECHANICAL LME LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490,36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[D ccarw35] <br /> :LLD MANUFACTURER(S):FE Potro-STP-MLD VMI 490-37' MODEL#(s):Va oriess LD-2000 490.39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.ph.LEAK TESTS.ID MRg26361 490:9. <br /> ELLD MANUFACTURER(S): 490-0R MODEL#(S): 4900,1. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MIN[MUM ANNUAL 0,1 g.p.h. 490.x2. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490'43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49 .. <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> _ TEST FREQUENCY: ❑ a_AN__NUALL_Y ❑ b.EVERY3Y_EARS ❑ c.OTHER(Spec[fy) 490A90.46. <br /> ❑ 5.VISUAL PIPE MONITORING, 490.4,. <br /> FREQUENCY: ® a.DAILY ❑ b.WEEKLY ❑ o.WN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49" <br /> •Nlow4d for mmiirorinx ofuobuid emervexv pencazorfuel iPinx oNY per}ISC 253a1_SLb)(3�___._ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[D CCR§2636(.)(3)1 49050. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 49051. <br /> ❑ <br /> 99. ER(Specify) 49x52. <br /> 49053. <br /> UPCF UST-D(122007)-1/4 www.unidoe&org <br />
The URL can be used to link to this page
Your browser does not support the video tag.