- A B C D E � F
<br /> CENERO! IT. MATER W.S 3. CONDUIT 4. TESTING OF SECONDARY (EXTERNAL) TANK
<br /> A CO
<br /> MATERIALS SUPPLIED BY NTRACT o) REFER TO CONSTRUCTION DRAWINGS FOR MINIMUM SIZE CONDUITS. OTHERWISE a) MAINTAIN PRESSURE ON THE PRIMARY TANK, PLUG ALL OREN FFTRNGS ON THE
<br /> A DESCRIPTION MINIMUM SIZE SMALL BE 3/4" DIAMETER. SECONDARY TANK.
<br /> 1. WORK INCLUDED THE CONTRACTOR SHALL PURCHASE AND INSTALL All MATERIALS EXCEPT AS
<br /> INDICATED, CONTRACTOR SWILL NOT DEVIATE FROM MATERIALS OR PRODUCTS b) FTTTNGS SHALL BE CONSISTENT AND COMPATIBLE WITH RELATED RACEWAY MATERIAL b) CONNECT AIR HOSE FROM THE PRIMARY TANK TO THE SECONDARY. 1
<br /> INSTALLATION OF TANK TOP HARDWARE, PIPING AND TANK MONITORING SPECIFIED UNLESS THROUGH MUTUAL AGREEMENT WITH 76 PRODUCTS COMPANY EMT CONNECTORS SHALL BE PRESSURE GLAND TYPE.
<br /> SYSTEMS. TESTING OF TANK AND PIPING INSTALLA11ONS AT 76 Pd90UC75 COMPANY REPRESENTATIVE. SUBSTITUTE MATERIALS SHALL BE DESCRIBED, SPECIFYING c) USE THE PRIMARY TANK AIR PRESSURE TO PRESSURIZE THE SECONDARY TANK TO 5
<br /> FACILITIES OR INTERESTS. THIS SPECIFICATION IS FOR NEW INSTALLATIONS ANY DIFFERENCES IN COST. ONLY NEW MATERIALS SHALL BE USED. c) BELOW GROUND - ALL CONDUIT WITHIN THE TANK EXCAVATION SHALL BE RIGID METAL PSIG, DD NOT U5E AN AIR COMPRESSOR TO PRESSURIZE THE SECONDARY TANK
<br /> AND RE-WORKING OF EXISTING TANK INSTALLATIONS, PVC COATED CONDUIT. CONDUIT AT THE BRAVO BOXES, SUMPS GUTTER BOXES, ETC. SHALL
<br /> B. FIBERGLASS REINFORCED EPDXY PIPING MMERWLS HAVE A MINIMUM OF,8 FEET OF RIGID METAL PJC COATED CONDUIT. ALL OTHER BELOW d) DISCONNECT THE AIR SUPPLY AND ALLOW THE AIR PRESSURE IN THE SECONDARY TANK
<br /> 8. DUALITY ASSURANCE i fFNFRAI GRADE CONDUIT MAY BE RICID SCHEDULE 40 FVC CONDUIT WD A MINIMUM OF 24' BELOW TO STABILIZE
<br /> GRADE.
<br /> I. 5KLLLLwDRKM ALL PIPE AND FITTINGS SHALL BE AMERON DUALOY 3000L OR AD. SMITH e) MONITOR THE PRESSURE FOR A PERIOD OF ONE HOUR. SOAP EXPOSED EXTERIOR OF
<br /> (RED THREAD IIA) PIPE WITH UNDERWRITERS LABEL AND COMPATIBILITY WITH ETHANOL AND METHANOL d) ABOVE GROUND AND OUTSIDE OF THE BUILDING - CONDUIT SHALL BE HOT-DIPPED THE TANK, ALL FITTINGS AND MANWAYS AND WATCH FOR ACTIVE AIR BUBBLES THAT
<br /> USE ADEQUATE NUMBERS OF SKILLED 'WORKERS WHO ARE THOROUGHLY FUEL BLENDS. RED THREAD PIPING AND FITTINGS ARE NOT GALVANIZED RIGID STEEL CONDUIT CONFORMING TO ANSI STANDARD 80.1. INDICATE A LEAK.
<br /> TRAINED AND EXPERIENCED IN THE NECESSARY CRAFTS AND WHO ARE INTERCHANGEABLE WITH AMERON DUALOY 3000/L DO NOT MIX
<br /> COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND THE MANUFACTURERS e) INSIDE THE BUILDING - CONDUIT NOT CONCEALED SHALL BE HOT-DIPPED GALVANIZED C. METAL PIPE AND FITTINGS
<br /> METHODS NEEDED FOR PROPER PERFORMANCE OF THE WORK OF THIS EMT CONFORMING TO ANSI STANDARD CBOJ.
<br /> SECTION. 2. AMERON DUALOY 3000/I FIBERGLASS PIPE AND FITTINGS 1. TANK VENT RISERS
<br /> 4. CONDUITSEALS IN FWZARDOUS LOCATIONS
<br /> 2. MANUFACTURER CERTIFICATIONS a) PIPE - FILAMENT WOUND FIBERGLASS REINFORCED EPDXY PIPE WITH INTEGRAL EPDXY a) FREE STANDING VENT RISERS SHALL BE A MINIMUM OF 12 FT. ABOVE THE
<br /> LINER AND EXTERIOR COATING. EXPLOSION PROOF UNIONS, COUPLINGS, REDUCTIONS ELBOWS AND CONDUIT SURROUNDING GRADE, SECURED TO THE VENT STAND PER DRAWING J-1.1.
<br /> a) ONLY MANUFACTURER TRAINED AND CERTIFIED WORKERS MAY INSTALL UNDERGROUND BOXES SHALL BE THE ONLY ENCLOSURES OR FITTINGS PERMITTED BETWEEN
<br /> PIPING SYSTEMS AND RELATED HARDWARE. b) FITTINGS - COMPRESSION MOLDED AND FILAMENT-WOUND REINFORCED EPDXY. THE SEAL FITTING AND ENCLOSURE. b) TANK VENT RISERS PLACED AGAINST EXTERIOR WALL OF BUILDING SHALL BE SPACED
<br /> AS SHOWN ON DRAWING J - 1.1 AND SECURELY ATTACHED TO WALL. TANK VENT RISERS AT
<br /> b) CONTRACTORS INSTALLING VEEDER-ROOT TANK MONITORING SYSTEMS MUST BE A cj ADHESIVE - AMERON B20 AMBIENT CURE, TWO PART EPDXY FOR ALL SERVICE F. BED AND BACKFILL MATERIAL BUILDING SHW-L TERMINATE A MINIMUM OF 18" ABOVE PARAPET OR EAVE (WITH
<br /> IEVEI I AUTHORIZED SEFMCE CONTRACTOR, AS A MINIMUM. (INCLUDING ALCOHOL) PRESSURE REUEF VALVE IF REQUIRED).
<br /> _ - 1. PEA GRAVEL
<br /> 3. SAFETY TRNNING 3. A 0 SMITH (RED THREAD IIA) PIPE2. TAPPED COATING
<br /> a)
<br /> MIX OF ROUNDED PARTICLES MUST HAVE A MINIMUM DIAMETER OF 1/8' AND A MAXIMUM
<br /> a) REVIEW CONFINED SPACE ENTRY PROCEDURES AND CAL O.S.H.A. AND FEDERAL o) PIPE - GLASS FIBER REINFORCED FILAMENT WOUND IN A MATRIX OF EPDXY RESIN. DIAMETER OF 3/4'. NO MORE THAN 5% OF THE BACKFILL SHALL PASS THROUGH A No. 8 a) CONTRACTOR SHALL TIGHTLY WRAP All BURIED STEEL PIPING, TANK ANNULUS RISER,
<br /> O.S.H.A. REGULATIONS FOR WORKERS ENTERING OPEN EXCAVATIONS ON HOW THEY APPLY THE SIEVE. INCLUDING THREADS AND FITTINGS, AND VENT UNES.
<br /> PARTICULAR PROJECT. b) FITTINGS - COMPRESSION MOLDED FITTINGS USING AND EPDXY MOLDING COMPOUND
<br /> CONTAINING A MINIMUM OF 45% CHOPPED FIBERGLASS. b) STANDARD SIZES OF COARSE AGGREGATES PER ASTM D-448, ASTM C-33 AND AASHTO M 43 b) APPLY TWO (2) LAYERS OF 1-INCH WIDE CORROSION PROTECTION TAPE (POLYKEN 940
<br /> b) PREPARE 76 PRODUCI5 COMPANY FACILITIES AND SHE DEVELOPMENT SITE SAFETY WORK OR SCOTCHWRAP 50 10 MIL THICK). EACH LAYER SHALL BE SPIRAL WRAPPED WITH A 1/2
<br /> PLAN SUMMARY, AND THOROUGHLY REVIEW THE PLAN WITH ALL ASSOCIATED WITH THE WORK c) ADHESIVE - A 0, SMITH DS-8000 (PRIMARY PIPE) AND DS-7000 (SECONDARY PIPE) WIDTH OVERLAP.
<br /> SCOPE. UL LISTED FOR PETROLEUM PRODUCTS, ALCOHOL, AND PETROLEUM / ALCOHOL BLENDS. p
<br /> . 5AND EXTERNAL HEAT CURE, TWO PART EPDXY. c) AT CONNECTIONS BETWEEN STEEL AND FIBERGLAS PIPE, TAPE SHALL EXTEND 2
<br /> c) PREPARE IT FRODUCIS
<br /> GUIDE
<br /> COMPANY FACILITIES AND SITE DEVELOPMENT WORK PERMITS,
<br /> All ELECTRICAL CONDUITS OUTSIDE OF THE TANK EXCAVATION AND PIPE INCHES (MINIMUM) ONTO FIBERGLASS PIPE. TAPE SHALL BE CARRIED UP TO THE 2-INCH
<br /> COMPLY WITH ALL GUIDE UNES. 4. CERRFlCAl10N TRENCHES MAY BE BACKFILLED WITH FILL SAND. COUPLING AT VENT LINES.
<br /> d) CONTRACTOR SHALL USE APPROPRIATE PERSONAL SAFETY EQUIPMENT WHEN HANDLING FIBERGLASS THE JNSTALLEB MUST BE FACTORY CERTIFIED BY AMERON OR A 0. SMITH, D. FIBERGLASS REINFORCED EPDXY PIPING
<br /> PIPE, ADHESIVES AND SOLVENTS. THE USE OF GLOVES, SAFETY GLASSES, DUST MASKS, AND[ BE FAMILIAR WITH THE LATEST INSTALLATION MANUALS, AND OTHER
<br /> ETC. ARE MINIMUM REQUIREMENTS. ALL APPUCABLE SAFETY CODES ARE TO BE FOLLOWED. MANUFACTURER'S BULLETINS AND LITERATURE PERTAINING TO FIBERGLASS I. STORAGE. DELIVERY AND HANDLING OF PIPE MATERIAL5
<br /> REINFORCED PIPE, FIBERGLASS REINFORCED EPDXY PIPING MUST BE STORED, DELIVERED, AND
<br /> C. JOB CONDITIONS
<br /> 2 C. METAL PIPE AND FITTINGS III )XECUTIOjj HANDLED LA BY THE INSTALLING CONTRACTOR PER MANUFACTURER
<br /> . L
<br /> INSTALLATION INSTRUCTIONS, DAMAGED WRING IS NOT TO BE
<br /> 1 GENERA
<br /> NOTE: STEEL PIPE AND FITTINGS WILL BE USED ONLY WHERE 0. TANK TOP HARDWARE INSTALLATION INSTALLED.
<br /> WORKING ON UNDERGROUND STORAGE TANKS THAT CONTAIN NEL OR HAVE SPECIFICALLY CALLED FOR ON PLANS. ALL OTHER PETROLEUM PIPING,
<br /> CONTAINED FUEL IS A HAZARDOUS OPERATION, EXTREME CARE IS TO BE FTFTINGS AND ADHESIVES SHALL BE AMERON DUALOY 3000/L OR A. 0. 1. TANK RISERS 2. PIPEWAY TRENCH EXCAVATION
<br /> TAKEN WHEN WORKING IN THIS ENVIRONMENT. THE ADDITIONAL HAZARDOUS SMITH RED THREAD IN WITH UNDERWRITERS LABEL AND METHANOL
<br /> CONDITION OF WORKING IN AN OPEN EXCAVATION IS TO BE EQUALLY COMPATIBLE. a) PLUG ALL UN-USED TANK FIRINGS WITH STEEL TANK PLUGS. DO NOT FIBERGLASS a) ALL PPWAY TRENCHES TO BE WIDE ENOUGH TO ALLOW A MINIMUM OF 4' SPACING
<br /> REVIEWING THE JOBSRE CONDITIONS. BETWEEENNPIPES, AND 6" FROM PIPE TO TRENCH WALLS.
<br /> CONSIDERED WHEN
<br /> OVER ANY PLUGGED FITTINGS WITHIN THE CONTAINMENT SUMP.
<br /> 1. METAL PIPE.
<br /> 2. NEL LEVEL b) INSTALL TANK TOP VALVES AND FTRINGS PER PLANS, CUT, THREAD AND INFROM FINISH GRASTALL b) ALL TRENCHING ADE COVER.
<br /> ALLOW FOR A MINIMUM 6" BEDDING FOR PIPING AND MINIMUM 18'
<br /> ALL STEEL PIPING, INCLUDING TANK RISERS, SHALL 8E BLACK IRON PIPE RISERS WHERE SHOWN ON PIANS, ENSURING PROPER CLEARANCES, AND TOLERANCES.
<br /> a) FOR NEW TANK INSTALLATIONS, OR WORKING ON TANKS THAT HAVE NOT PREVIOUSLY (EITHER ASTM A 53 OR ASTM A 120), SCHEDULE 40 , WELDED OR
<br /> CONTAINED FUEL, ALL SAFE WORK PRACTICES APPLY, EXCEPT THOSE THAT REFER TO TANKS SEAIMESS. c) THREADS SHALL BE CLEAN, FULL LENGTH, COATED WITH PETROLEUM RESISTANT THREAD c) ALL TRENCHING TO SLOPE A MINIMUM OF 1/4" PER FOOT BACK TO TANKS.
<br /> THAT CONTAIN OR HAVE PREVIOUSLY CONTAINED FUEL. 2. METAL. FITTINGS LUBRICANT (PERMATEX 1112, OR EQUAL), TIGHTEN PIPE AND FITTINGS TO REFUSAL 3. FILTER FABRIC INSTALLATION - (WHEN REQUIRED)
<br /> b) TANK RETROFIT PROJECTS, OR WHEN WORKING ON UNDERGROUND STORAGE TANKS THAT - 2. OVERFILL PROTECTION DROP TUBE
<br /> HAVE BEEN PREVIOUSLY IN SERVICE, PRIOR TO EXCAVATION OF TANKS, ALL TANKS ARE TO ALL SCREWED FITTINGS SHALL BE 300 Lb. MALLEABLE IRON PER a) AFTER TRENCH EXCAVATION HAS BEEN COMPLETED TO PROPER SIZE, THE TRENCH WILL
<br /> BE FILLED TO CAPACITY, REDUCING THE ULLAGE OR HEAD SPACE SPECIFICATION ASTM A 197 AND DIMENSIONAL STANDARD ASA B 16 - 20. INSTALL THE OVERFILL PROTECTION DROP TUBE PER MANUFACTURER?S BE LINED WITH A FILTER FABRIC MATERIAL INSTALLED IN ACCORDANCE WITH
<br /> BLACK IRON FTFDNGS SHALL BE USED ON ALL STEEL LINES. THE INSTRUCTIONS. ENSURE THAT THE DROP TUBE IS A MINIMUM OF 4' AND A MANUFACTURERS RECOMMENDATIONS. FILTER FABRIC SHALL CONFORM TO THE FOLLOWING:
<br /> c) IF (I IS NOT DESIRABLE 70 HAVE THE TANK FULL, THEN THE TANK IS TO BE _ MATERIAL SPECIFICATION FOR BLACK IRON FITTINGS SHALL BE ASTM A MAXIMUM OF 6' FROM THE BOTTOM OF THE TANK.
<br /> COMPLETELY EMPTIED, DE-GASSED, CLEANED, AND CERTIFIED TO HOT WORK PER FEDERAL 105, OR ASTM A 181. DUPONT "TYPAR' STYLE J401 - 4 oz. / Sq. 'Yd.
<br /> STATE, AND LOCAL REGULATIONS, AND 76 PRODUCT COMPANY UNDERGROUND TANK 3. SUBMERSIBLE PUMP
<br /> SPECIFICATIONS. D. TANK TOP AND PIPING HARDWARE HOECHST 'TREVIRA' SME 1114 - 4 oz. / Sq. Yd.
<br /> 1. TANK( TOP EQUIPMENT o) INSTALL SUBMERSIBLE PUMP RISER AT THE PROPER LENGTH TO MEET PROPER b) FILTER FABRIC SHALL BE OVERLAPPED 2 FT. MINIMUM AT ALL JOINTS. FOLD OVER AT
<br /> 3. VAP N CLEARANCES AND TOLERANCES. TOP OF EXCAVATION WHEN BACKFILLING IS COMPLETE.
<br /> a) TOP OF UNDERGROUND STORAGE TANKS TO BE EXPOSED WITH THE BACKFILL IN PLACE 76 ,PRODUCTS COMPANY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND b) SET ADJUSTABLE LENGTH OF SUBMERSIBLE PUMP SHAFT TO SUBMERSIBLE PUMP IS A
<br /> AROUND THE SIDES AND ENDS OF THE TANKS. STOIRAGE TANK STANDARD J-0.4 MINIMUM OF 4' AND A MAXIMUM OF 6` FROM THE BOTTOM OF THE TANK. DO NOT INSTALL c) FILTER FABRIC LINER WILL BE REQUIRED ONLY WHEN ACTUAL SOIL CONDITIONS
<br /> WARRANT, LOOSE, POORLY GRADED OR SILTY SAND SOIL WILL NORMALLY REQUIRE FILTER
<br /> SUBMERSIBLE P IMP IF TANK IS LASTED WITH WATER
<br /> b) IF TANK BURIAL DEPTH IS 5 FEET OR GREATER, ADEQUATE SLOPING OR SHORING IS 2. PVMIPABIUITY EQUIPMENT FABRIC. THE 76 PRODUC75 COMPANY REPRESENTATIVE SHALL DETERMINE WHEN LINER IS TO
<br /> TO BE PROVIDED PER CAL O.SMA. OR FEDERAL OSHA. REQUIREMENTS, 4. MECHANICAL LEAK DETECTOR BE INSTALLED.
<br /> 76 A'RDIX/CIS COMP.4VY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND 4. TRENCH BEDDING. AND BACKFIWNG
<br /> c) TANKS THAT CONTAIN FUEL ARE TO BE VENTED TO AT LEAST 12 FEET ABOVE THE STORAGE TANK STANDARD J-0.5 0) INSTALL MECHANICAL LEAH DETECTOR PER MANUFACTURES INSTRUCTIONS. TOP OF LEAK DETECTOR ED
<br /> SURROUNDING GRADE WITH A VENT PIPE, All OTHER OPENINGS ARE TO BE CAPPED TIGHT
<br /> WITH THREADED STEEL PLUGS. 3. 1SLAIND QUIPM NT BE A MINIMUM OF 8' TO A MAXIMUM Of 18' BELOW GRADE. a) BEDDING TO BE A MINIMUM OF 6' OF COMPACTED PEA GRAVEL.
<br /> 4, PRF-GONSRUGTION TANK TESTING (TANK PREVIOUSLY IN SERVICE) 76 P8000CI5 COMPANY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND b) GRADE BED SMOOTH WITH A MINIMUM OF 1/4' PER FOOT FALL BACK TO TANKS.
<br /> a) PRIOR TO COMMENCEMENT OF WORK, THE TANKS ARE TO BE TESTED FOR TIGHTNESSSTORAGE TANK STANDARD J-0,5 b) COMPLETE WARRANTY INFORMATION CARD AND SUBMIT TO 76 PRMC75 COMPANY
<br /> NT REPRESENTATIVE.
<br /> USING NITROGEN. 4. MONITOR EQUIPMEc) INSTALL PIPING WITH NO TRAPS OR SUMPS.
<br /> b) TNF TANKS ARE NOT TO HAVE GREAMR THAN 5 PSIG PRESSURE AT ANY TIME. 76 PROOUCTS Q7MPANY SUPPLIED MATERIAL PER PACKAGES ON UNDERGROUND 8. TANK TOP HARDWARE TESTING d) CAREFULLY PLACE 8' OF PEA GRAVEL COVER Q HAND TO ENSURE
<br /> PROPER PIPING COVER AND SUPPORT. USE EQUIPMENT ONLY AFTER 8' COVER IS HAND- Z
<br /> 3 STORAGE TANK STANDARD J-0.6 i GENERA) PLACED AND TAMPED.
<br /> c) SOAP TEST THE EXPOSED PORTON OF THE TANK AND IMMEDIATELY REPORT ANY e) SPECIAL CARE SHALL BE TAKEN TO PREVENT THE INTERMIXING OF STONES, DIRT
<br /> DEFECTS OR LEAKS. E. FUEL SYSTEM ELECTRICAL MATERIALS NEVER USE AER TO TEST PIPE THAT CONTAINS. OR HAS PREVIOUSLY CLODS, OR OTHER DEBRIS WITH CLEAN BACKFILL AROUND THE PIPE, OR FLEX CONNECTORS.
<br /> D. REIATFD SPECIFIGaTONS AND REQUIREMENTS 1. MATERIAL SUPPLIED BY CONTRACTOR CC,QNTAINED PRODUCT USE NITROGEN OR OTHER NON-FLAMMABLE GAS
<br /> 5. PIPE LAYOUT AND FITTING
<br /> 1, FEDERAL STATE AND LOCAL REGULATIONS. THE CONTRACTOR SHALL PURCHASE AND INSTALL ALL MATERIALS. ALL
<br /> 2. TANK ZEST MANIFOLD
<br /> MATERIALS SHALL BE NEW AND FIRST QUALITY AND SHALL BE LISTED BY A a) CONTRACTOR TO PROVIDE TANK TEST MANIFOLD PER MANUFACTURERS INSTALLATION ALL PIPEWAYS TO BE UNIFORMLY SPACED AND PARALLEL TO DISPENSING
<br /> THESE SPECIFICATIONS ARE THE 76 PRODUC75 COMPANY REQUIREMENTS, NATIONALLY RECOGNIZED TESTING UB. INSTRUCTIONS AND THESE SPECIFICATIONS. ISLANDS, PIPELINES SHALL BE PLACED IN STRAIGHT RUNS, USING
<br /> FEDERAL, STATE AND LOCAL REQUIREMENTS MAY DIFFER SUBSTANTIALLY. FITTINGS AS REQUIRED. PIPE WORK OVER TANKS OR UNDER BUILDING
<br /> THE STRICTER OF THE CONFLICTING REQUIREMENTS SHALL BE GUIDING. 2. WIRES AND CABLES b) CONTRACTOR TO FURNISH AIR PRESSURE GAUGE WITH A MAXIMUM FULL SCALE READING FLOORS SHALL BE AVOIDED. PIPE UNDER CONCRETE STABS SHALL BE
<br /> NOTIFY 76 PAIODtICTS COMPAAO` REPRESENTATIVE OF ANY CONFLICTS. OF 15 PSIG WITH 1/4 OR 1/10 PSIG INCREMENTS. PRESSURE GAUGE TO BE IN GOOD UNITED TO THE MINIMUM REQUIRED TO REACH DISPENSERS.
<br /> o) ALL MONITORING COMMUNICATION WIRING SHALL BE SHIELDED CABLE. REPAIR, AND HAVE A CALIBRATION DATE W11HIN 30 DAYS OF USE. PRESSURE GAUGES 6. JOINT BONDING AND ADHESIVE CURING
<br /> 2. UNDERGROUND STORAGE TANK SPECIFICATIONS DAMAGED OR OUT OF CALIBRATION WILL NOT BE PERMITTED.
<br /> b) WIRING INSIDE BUILDING AND ABOVE GROUND SHALL TYPE iTHWN. WIRING IN
<br /> REMOVAL AND DISPOSAL SPECIFICATION - REV 5 - 1/6/97 (J-O) CONDUIT UNDERGROUND OR IN DAMP LOCATIONS SHALL BE TYPE TTWTL c) CONTRACTOR TO FURNISH A PRESSURE RELIEF VALVE, SET AT 6 PSIG. RELIEF VALVE APPLY ADHESIVE TO JOINTS PER MANUFACTURER'S INSTRUCTIONS. ALLOW
<br /> c) THE MINIMUM SIZE CONDUCTOR SHALL BE No. 12 GAUGE AND MAY BE STRANDED OR TO BE IN GOOD REPAIR, AND HAVE A ION WILL
<br /> DALE WITHIN 30 DAYS OF USE. RELIEF PROPER CURE TIME, OR USE HEAT BLANKETS TO CURE JOINTS PER
<br /> INSTALLATION SPECIFICATION - REV 5 - 1/6/97 (J-0.1)
<br /> SOLID. No. 6 GAUGE AND LARGER SHALL BE STRANDED. VALVES DAMAGED OR OUT OF CALIBRATIONWILL NOT BE PERMITTED MANUFACTURER'S REQUIREMENTS.
<br /> CONTAINMENT SUMP AND COLLAR INSTALLATION SPECIFICATION - REV 1 - 5/22/96 (J-0:3) d) ALL CONDUCTORS SWILL BE COPPER. 3. TESTING OF PRIMARY TANK TOP HARDWARE -
<br /> _
<br /> 3. ELECTRICAL SPECIFICATION - REV 0 - 6/5/96 a) CONNECT THE TEST MANIFOLD TO AN AVAILABLE PRIMARY TANK RISER. CHECK TO
<br /> ENSURE THAT All. REMAINING TANK RISERS AND FITTINGS ARE PROPERLY DOPED, PLUGGED
<br /> AND TIGHTENED.
<br /> bj OPEN THE MONITOR FITTING NOT CONNECTED TO THE HOSE QUICK DISCONNECT
<br /> FITTING.
<br /> c) PRESSURIZE THE PRIMARY TANK TO 5 PSIG, ADD OR REMOVE AIR AS NECESSARY AND
<br /> ALLOW THE PRESSURE TO STABILIZE CLOSE THE VALVE ON THE TEST ASSEMBLY AND
<br /> DISCONNECT FROM THE AIR SOURCE
<br /> d) MONITOR THE PRESSURE FOR A PERIOD OF ONE HOUR. SOAP ALL FITTINGS AND
<br /> MANWAYS AND WATCH FOR ACTIVE AIR BUBBLES THAT INDICATE A WK.
<br /> USE APPLICABLE SECTIONS ONLY
<br /> 4 REV DATE REVISED iDENRO EARIM DA B IN BY APPROVAL RECORD APPROVALS
<br /> © UNION OIL OF CALIFORNIA, dba UNOCAL, 1994 YREST09E �„� K DRAWN ff TAIL
<br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ISSUED FOR C.U.P. CIIECX W WD UNDERGROUND FUEL TANKS
<br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS �E GENERAL SPECIFICATIONS, PIPING AND TESTING
<br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE ISSUED FOR PLAN CHECKAPPRM (CONTINUED ON J-0.2A)
<br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL
<br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE ISSUED FOR GEN. 810
<br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT wTE 1-27-97 Leavr�tss war > oAArnNc � n� rru
<br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL ISSUED FOR CONSTRUCT. OFEE
<br /> IN WRITING. � NONE ' PAODUCTS COIIPAA► J - 0 . 2 "EF'
<br /> RECORD DRAWING (oxamrcroa awrxm+).