Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— (Page 2 of 3) <br /> VI.UNDER DISPENSER CONTAINMENT (UDC)MONITORING (check an <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) 490 sa4 <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING El 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-541,. <br /> ❑ 4.NO,DISPENSERS.__._.............____.____......._.._...__0._99.OTHER(Specify) ._..._._._ <br /> 490-55. MODEL p:TLS-350 osis-ss. <br /> LEAK MONITOR MANUFACTURER:Veeder Root <br /> 490-s7. MODEL 4(s): 490-58. <br /> LEAK SENSOR MANUFACTURER:V@ed@T Root 49o-s9. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. E a.YES ❑ b.NO <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a YES ❑ b.NO 490fi0_ <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑ b.NO 490-61' <br /> UDC MONITORING STOPS THE FLOW QF PRODUCT AT THE DISPENSER. E a.YES ❑ b.NO 490-62 <br /> UBLE WALL <br /> IF DOUBLE WALL: _ 490aL <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ��a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED In CCR ps,,4.1] <br /> .SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066 <br /> 49067 <br /> ® 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maimenance records are kept for this facility: 490-68_ <br /> ® a.ALARM LOGS E b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> E h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> E Personnel with UST monitoring responsibilities are familiar with all ofthe following documents relevant to theumb duties: 490-696 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> E THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490 % <br /> E OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4906%L <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490694 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69[ <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-698. <br /> ❑ OTHER(Specify): 490-69h <br /> 490691 <br /> E This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490a0. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> D The facility employee's role with regard to spills and overfills w specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> -by thisplan occurs_2)all conditions that indicate a possible release are mvestigated;,and 3)all monitoring records are maintained ............ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: SYED K. AHMED 490-72, TITLE VICE PRESIDENT 490'71' <br /> NAME: 490-74. TITTLE: 490-75 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action <br /> X11- OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I cern at a infvrnaXoltP7ftjdcd herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77. <br /> REPRESEM G®1.Trak 0. 1Yor a itirismer/QperatoN3.AutrorihdRresentatiwofOwner 490-76. <br /> APPLICANT NAME(print): 490-7e. APPLICANT TITLE- d90'19 <br /> SYED K.AHMED Vice President <br />