Laserfiche WebLink
,. RECEIVED <br /> SWRCB,January 2002 OEM 1--9� <br /> 6. PIPING SUMP TESTING A <br /> Test Method Developed By: 11 SUMP Manufacturer El Industry Standard X Pr A <br /> HFAITu n=aPTA,1FAIT <br /> [I Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1-87 Sump#2-87 Sump#3-Diesel Sump# <br /> Sump Diameter: 46"Hexagon 46"Hexagon 46"Hexagon <br /> Sump Depth: 38" 38" 38" <br /> Sump Material: Poly Poly Poly <br /> Height from Tank Top to Top of 81, 8" 8" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 6" 6" 6" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Level 12" Water Level 12" Water Level 12" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes <br /> shutdown?" <br /> Was fail-safe verified to be No No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 9:05 9:10 9:55 <br /> Initial Reading(Ri): .001 .001 .001 <br /> Test End Time: 9:35 9:40 10:25 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />