Laserfiche WebLink
Page Z of <br /> NRCB,MAY 2002 <br /> PIPE TESTxN Manufacturer industry Standard <br /> SECOND"Y <br /> Professional Engineer <br /> piping � Hydrostatic <br /> Test Method'Developed by= Other(Specify) <br /> Vacuum <br /> ed by; pressure <br /> Q Other(Specify) _jpsi <br /> Test Method Develop Equipment Resolution: <br /> PRES [TRE GAUGE Piping Run Piping Run <br /> Piping Run# # <br /> Equipment Used: 5 <br /> Test # 3 <br /> Piping Run# rZ <br /> r-- AP 67y <br /> piping Material: <br /> r �N <br /> piping Manufacturer: i+ <br /> �n <br /> piping Diameter: / <br /> Length of piping Run: /v <br /> product stored: <br /> Method and location of <br /> FS ,diel <br /> piping-run isolation: <br /> Wait time between applying O� S � <br /> pressure starting 3 4),c , <br /> $3 p�e..*a , o s <br /> S- s <br /> Test Start Time: S a <br /> Initial Reading(Rl) <br /> Test End Time. <br /> Final Reading <br /> Test Duration: p <br /> R,): �, a FAIL PASS Q FAIL <br /> Change in Reading(Rr- FAIL �PASSPass t Fail Threshold or Criteria: 6 gpAss FAIL laPAss <br /> �J <br /> ,TES RESULT' or failed tests) <br /> repairs,made prior to testing, and recommended follow-a p f <br /> Comments-^(include information on p <br />