Laserfiche WebLink
SWRCB. MAY 2002 Page—,3 of <br /> 7. UNDER-DISPENSER CONTAINWNT (UDC) TESTING <br /> Test Method Developed by: UDC Manufacturer Industry Standard Professional Engineer <br /> [� Other(specify) <br /> Test Method j./ �1 �] I'::-Ssum Vacuum Hydrostatic <br /> (! �` [j Othzr%Specify) <br /> Test Equipment Used: VM1 IQ E±_t- Equipment Resolution: .05 gph <br /> Um# �-Z UnC# 3- y UDC# 5-- G Unc# 7- <br /> UDC <br /> UDC Manufacturer: V1,01 0W Owd <br /> UDC Materials: <br /> UDC Depth: <br /> Height from UDC Bottom to Tbp r <br /> of Highest Piping Penetration: /rt, / <br /> Height from UDC Bottom to p <br /> Lowest ElectriraI-Penetration: <br /> Condition of UDC prior to testing: <br /> Portion of UDC Tested: ALL ALL ALL <br /> Does turbine shut down when UDC <br /> sensor detects either product or water? <br /> Turbine shutdown response time: <br /> Is system programmed for r r <br /> fail-safe shutdown? <br /> Was fail-safe verified to be -- --- <br /> operational? <br /> Wait time between applying press']&starting test: <br /> Test Start Time: <br /> Initial Reading(IQ 49ee"., / : d4> <br /> Test End Time: <br /> Final Reading(Rr): <br /> Test Duration: 7- <br /> Change in Reading(RF-R): ,y/ 13 j O.-C, <br /> Pass I Fail Threshold or Criteria: <br /> TEST RESULT; PASS [] FAIL ]a PASS ❑ FAIL PASS LI FAIL PASS ❑ FAIL <br /> Was sensor removed for testing? es[I No[]NA es C]No O NA Yes C]No C1 NA CoYes C3 No C)NA <br /> Was sensor properly replaced& <br /> verged functional after testing? Yes[3 No Q NA 1 j4Yes No 0 NA �Yes❑No C3 NA Qj Yes[❑No❑NA <br /> Comments--(include information on repairs made prior to testing;and mvommended foffow-up for failed tests) <br />