Laserfiche WebLink
SWRCB, MAY 2002 • oyo V <br /> 9. SPILL/ OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes❑ <br /> Spill/Overfill Containment Boxes are Present,But Were Not Tested ❑ <br /> Test Method Developed by: ❑ Spill Bucket ManufacturerfflJndustry Standard professional Engineer <br /> ❑ Other(Specify) <br /> Test Method. ❑ <br /> Pressure (3 vacuum Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: V r r• tt EquipmenResolution: <br /> t <br /> Spill Box# Spill Box# ;_7 Spill Box# 3 Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: �G/k 10i fe• O <br /> Weight time between applying <br /> pressure/vacuum/water&start test: 7 1w Aly �✓ <br /> Test Start Time: ,g <br /> Initial Reading(Rr) <br /> Test End Time: <br /> Final Reading(R.): Gam•+ y �"�/ / <br /> Test Duration: 30...73 m•+ �G•s�l <br /> Change in Reading(Rr- R.): o /�+++ ��•'/ <br /> Pass/Fail Threshold or Criteria: /OS +s^Y <br /> Df I H ep-5- <br /> TEST <br /> TEST RESULT: C7rPASS ❑ FAIL PASS ❑ FAIL PASS ❑ FAIL ❑ PASS ❑ FAIL <br /> COMMerkts—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />