Laserfiche WebLink
Ask <br /> UNIFIED PROGRAM CONSOLIDATED FORMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 690'1 <br /> • PLAN TYPE 1&M 1.MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. 6902 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(A)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ 1 <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> BUSINESS SITE ADDRESS �2 ; �' 103. CRY 106 <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is mom frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED a.1.ANNUALLY ❑ 99.OTHER(Specify): 490.34 <br /> 490.3b <br /> III.MONITORING LOCATIONS <br /> '�I 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 112.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (73 CCR§2632, <br /> 2'634 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> -.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 49x5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: Va.DRY ❑ b.LIQUID FILLED ❑ C.PRESSURIZED ❑d.UNDER VACUUM 49 <br /> PANEL MANUFACTURER: 1 \ 4z MODEL#: E. L. 490.3 <br /> LEAK SENSOR MANUFACTURER: f L 49°'9. MODEL#(S): 49_10 <br /> 2.AUTOMATIC TANK GAUGING(ATC)SYSTEM USED TO MONITOR SINGLE WALL TANKlS).(23 CCR§2643) 49_1 i <br /> PANEL MANUFACTURER: 49_iz MODEL#: 49-13 <br /> IN-TANK PROBE MANUFACTURER: 690'16 MODEL#(S): 49-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 49x16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 49-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 gp.h. ❑ c.OTHER(Specify): 4y :9a <br /> ❑ 3.MONTHLY STATISTTCAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490¢0 <br /> • ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49x21 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49_23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49_24 <br /> 49-25 <br /> ❑99.OTHER (Specify): 49x26 <br /> 490.21 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> .CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:OitDRY ❑b.LIQUID FILLED [3c.PRESSURIZED ❑d.UNDER VACUUM 49-29 <br /> PANEL MANUFACTURER: .f 6903° MODEL#: PIC, 490-31 <br /> LEAK SENSOR MANUFACTURER: 490"32 MODEL#(S):-7-05- 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 490.34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IECTED 23 CCR 263 490.36 <br /> MLLD MANUFACTURER(S): S DET69033 MODEL#(S): OD 490'38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURER(S) 49Wa. MODEL#(S): 49_41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49 12 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49 13 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 49015 <br /> TEST FRE UENCY a.ANNUALLY b.EVERY 3 YEARS El c.OTHERS i 49-46 49o.17 <br /> 5.VISUAL PIPENITORING. 49o.0 <br /> FREQUENCY DAILY ❑ b.WEEKLY El DAILY MONTHLY R EACH TILE SYSTEM OPERATED- 49_49 <br /> m <br /> •mio foriionn of wtgidem emuamr fual pnog wy paHBC§25291.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)l. 49_50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49_51 <br /> • ❑ 99.OTHER(Specify) -9052 <br /> 490.51 <br /> UPCF UST-D(1212007)1/4 <br />