Laserfiche WebLink
• UNIFIED PROGRAM CONSOLIDATED FORMW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> • I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 49 543 <br /> MI ❑ El CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY 3.ELECTRONIC STAND-ALONE 49a-54b <br /> ❑4.NO DISPENSERS 099.0 <br /> THERS ci ): <br /> PANEL MANUFACTURER: " ( 4so-ss MODEL#: V 49 56. <br /> LEAK SENSOR MANUFACTURER: 490.51 MODEL#(S): 490.53 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ga.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN �a YES [3b.NO 49a6o. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 49°'61 <br /> UDC MONITORING STOPS�THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 49062 <br /> y <br /> 2.UDC CONSTRUCTION IS L 7 SINGLE-WALLED 112.DOUBLE-WALLED 49 3 <br /> IF DOUBLE WALLED: 49064. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1.LIQUID 2.PRESSURE 0 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49 b <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49 5. <br /> LEAK DETECTION LELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49056 <br /> _Jal.SPILL BUCKETS ARE TESTED ANNUALLY. 490o-67 <br /> VIII.RECORDKEEPING <br /> Th following monitoring/ma' nonce records are kept for this facility: <br /> Alarm logs 490-683 Visual Inspection Records 490.686 ❑Tank integrity testing results 39o*& <br /> ❑SIR testing results(and supporting documentation records). 49o-63d ❑ Tank gauging results(and supporting documentation records). 49053. <br /> ❑ATG Testing results(and supporting documentation records).49o.63f ❑ Comasion Protection 60-day logs 490.683 <br /> '09Equipment maintenance and calibration records. 490.683 <br /> IX.TRAINING <br /> -Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)493696 <br /> • OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490594 <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49 w <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49069° <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49o59r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.693 <br /> ❑ <br /> OTHER(Specify):M69kms. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> e"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> • Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> • Names of contact person(s)for emergencies and monitoring alarms.4soao <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490.71 <br /> M.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The foi1Qgpn rson(s)a res nsi a for performing the monitoring and equipment main n0- <br /> NAME C 4s 72 TITLE 49 73 <br /> NAME 490-14 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APP NATURE 450.16 DATE: /�l/� 490-n <br /> s.Aim d, a `// V� l <br /> APPLICANT NAME(print): 10.18 APPLICANT TITLE: r 49039 <br /> UPCF UST-D(12/2007)3/4 Vw <br />