Laserfiche WebLink
CONSTRUCTION / <br /> INSPECTION A MATERIALS <br /> TESTING LABORA70RY <br /> 0r-on=a <br /> North American Technical Services <br /> FEB 2 6 2014 <br /> SUMMARY OF IN PLACE DENSITY EIMR{ONMEENNAL <br /> Project:USTRemovals-1250 N.Wilson Way Stockton Date: 1-17-2014 <br /> Client: Tafoya&Asssociates Work Order#: 17694 <br /> Inspector: Justin Hasley Location: Underground tank removal backfill <br /> TM Probe Elevafian DUD,"ty blaiswre% Mwt DegsJ Opt Relative Required Lmtioo <br /> NO. Deplb bta(sL De®ity Demity <br /> 5 1y, -3'FSG 115.0 12.0 125.QQ10.0°/a 92 90 IS'S IS'W of NE Lot Comer <br /> 6 12" -3'FSG 1171 9.4 125.0 1(a10.1P/o 94 90 40'S 25'W of NE Lot Comer <br /> 7 IT -2'FSG 120.7 11.9 125.0 Re10.0°/ 97 90 20'S 30'W of NE Lm Comer <br /> 8 12" -TFSG 1193 12.1 125.0(x10.0% 96 90 25'S 20'W of NE Lot Comer <br /> 9 12" -2'FSG 117.8 11.9 125.0 a 10.0% 94 90 50'S 10'W of NE Lot Comer <br /> Page 1 of 1 <br /> COMPLIANCE:The material tested meets the minimum compaction requirements of 90%�orpgreater. <br /> Date: 1-17-2014 Inspector: Justin Hasley Reviewed by: <br /> Signature <br /> JDf yell <br /> 458 A <br /> Fxp �.-�-�' <br /> \� 9 Tr'.,it a- <br /> jF <br /> 4713 EIJTERPRISE WAY•SUITE 4•MODESTO-CALIFORNIA -95356-209w545-1108 <br />