Laserfiche WebLink
ELI AmriOh CONSTRUCTION / <br /> ® INSPECTION B MATERIALS <br /> TESTING LABORATORY <br /> North Americans Technical Services E® <br /> FEB 2 6 2014 <br /> SUMMARY OF IN PLACE DENSITY ENVIRONMENTAL <br /> Project:UST RemovalsA250 N.Wilson Way Stockton Date: 1-15-2014 HEALTH DEPARTMENT <br /> Client: Tafoya&Asssociates Work Order#: 17694 <br /> Inspector: Justin Hasley Location: Underground tank removal backfill <br /> TEST Pb. E1.60 DryDensity Nloismre% blarN./OpL Reletive R,.itrd Loceaon <br /> NO. Depth M11o61. D.Wty DaoRy <br /> 1 12•• -6'FSG 113.1 11.5 125.00alo.00% 90 90 20'S 28'W of NE Lot Comer <br /> 2 12" -6'FSG 116.8 12.4 125.0(@10.0%0.0% 93 90 15'S 10'W of NE Lot Coma <br /> 3 12^ -5'FSG 115.5 13.8 125.010.0% 92 90 35'S 25'W of NE Lot Comer <br /> 4 12" -5'FSG 117.0 11.8 94 90 30'S 15'W of NE Lot Coma <br /> Page 1 of I <br /> Notes:"Lot Comer"excludes city sidewalk. <br /> COMPLL4NCE:The material tested meets the minimum compaction requirements of 90%or <br /> greater. <br /> Date: 1-15-2014 Inspector: Justin Hasley Reviewed by: <br /> Signature <br /> t ESS1p^ <br /> a4G • p.. Sp q�F <br /> 'o' <br /> c,( r� PID. 95S � <br /> V` <br /> " L?F CPl\�f <br /> 4713 ENTERPRISE WAY^SUITE 4•MODES TO•CALIFORNIA •95356•209-545-1108 <br />