Laserfiche WebLink
' BANKS & CO <br /> ' 4.0 REMOVAL OF THE EXISTING EQUIPMENT <br /> 4.01 REMOVING THE DISPENSERS <br /> Banks & Co. will be responsible for disconnecting the existing electri- <br /> cal wiring to the dispensers and breaker panel. The dispensers will be lifted <br /> off of the islands and left at the site for disposed by the customer. <br /> ' 4.02 PURGING OF THE PIPING <br /> All piping shall be disconnected at a point farthest away from the <br /> ' tanks. Liquid inside the piping will be drained, collected and properly <br /> disposed of. Banks & Co. will drain the existing piping back into the tanks <br /> and purge the lines with nitrogen. Any remaining residue will be removed or <br /> drained into a bucket, then placed back into the u.g. tank. <br /> ' 4.03 DISCONNECTING DISPENSERS AND CONDUITS <br /> Banks & Co. will disconnect the piping unions on the product piping and <br /> ' electrical conduits. The electrical wires will be capped and taped to <br /> eliminate electrical sparks. <br /> 5.0 TESTING PROCEDURES <br /> 5.01 TESTING OF PIPING <br /> All product piping will be tested with a Campo/Miller Precision Line <br /> Tester, capable of checking the piping at a leak rate of .05 gallons per hour <br /> leak rate. <br /> 6.0 INSTALLATION OF PROPOSED EQUIPMENT <br /> 6.01 INSTALLATION OF MULTI-PRODUCT DISPENSERS (MPD) <br /> ' The proposed MPD will be set over the existing dispensers holes using a <br /> backhoe or forklift. The existing piping will be relocated with flex lines to <br /> the proposed MPD location. If piping needs to be moved more than 2 feet, <br /> galvanized metal piping will be used to make the connections. All fittings <br /> ' will be wrapped with tape to protect the piping from the environment. <br /> The dispenser piping will have to be relocated approximately four feet. <br /> The piping will be installed with galvanized metal piping The piping will be <br /> ' pressure tested with a Campo/Miller Precision Line Tester. <br /> 6.02 ELECTRICAL CONNECTIONS <br /> ' The electrical conduits will be moved to the proposed MPD location by <br /> cutting off the existing conduits and re-threading the conduit. Banks & Co. <br /> will connect to the existing conduits with rigid metal conduits and ap- <br /> propriate explosion proof fittings. Banks & Co. will pull new wires for the <br /> ' MPD and connect as required. All electrical fittings and connections will be <br /> made in accordance with N.E.C. Codes and local requirements. <br /> 6.03 LEAK DETECTORS INSTALLATION <br /> ' Banks & Co has been asked install product line leak detectors in the <br /> existing Submerged Turbine Pump (STP) . We will remove the existing plug in <br /> the existing STP and replace it with a Red Jacket Line Leak Detector (LLD) . <br /> ' 7 SITE SAFETY PLAN <br />