Laserfiche WebLink
It has been established that the obligation of com- OPTION A <br /> ! pliance with the appropriate regulations covering <br /> USTs is the owners, with the following guidelines BASIC FUNCTION EVALUATION <br /> in place in reference to LLDs. Testing Red Jacket Mechanical <br /> ! EPA regulations require that the LLD be installed Line Leak Detectors with the <br /> and operating, capable of detecting a catastrophic Apparatus to verify Qperation (AVO) <br /> leak and tested annually in accordance with the <br /> ! manufacturer's requirements.The manufacturer's Option A: How to verify operation of Red Jacket <br /> requirements and procedures for annual testing of mechanical leak detectors.The apparatus to verify <br /> Red Jacket LLDs are covered in Option A, Form operation(AVO)will be required for this procedure. <br /> ! RJ-21 and Option B, Form RJ-20. While some It can be constructed from readily available parts. <br /> regulatory bodies have, EPA has not issued guide- See material list and assembly, p. 5. See pages 6 <br /> lines as to when LLDs are to be replaced based on and 7 for an explanation of Th ten Leak <br /> quantitative performance. They state that annual Detector Test. <br /> ! quantitative performance tests of LLDs installed <br /> in the field are not required by EPA standards.Itis I. INSTALLATION OF THE AVO <br /> suggested to check with state and local authorities <br /> ! <br /> for any requirements that may differ from those of Disable power to submersible <br /> thebefore attempting to con- <br /> nect AVO to impact valve. Fail- <br /> Based on the above and other pertinent factors,it ure to do so may cause an acci- <br /> is our opinion that the UST owner is the best dental discharge of pressurized <br /> equipped to assess their situations and therefore to gasoline that may result in per. <br /> make the decision as to when subject LLD is to be sonal injury, fire or explosion. <br /> replaced. We do not consider it prudent as the Tag or lock out submersible <br /> manufacturer to make that determination. pump breaker to avoid pump <br /> We do urge that if,after evaluation in the pumping being accidentally turned on. <br /> ! system,subject LLD is not demonstratingthecapa- 1. CarefaUybleed anyresidual pressure present <br /> bility of reacting to a leak of 5 GPH or greater, in the system, catching the fluid discharged in <br /> serious assessment be made of the entire pumping a suitable container.Ifthe test port of the shear <br /> system and of replacement of the LLD versus con- valve is used for this purpose,see the following <br /> tinued use. 097M in step 2 first. <br /> We have no control,influence or <br /> participation with reference to IM= Use a suitable container to re- <br /> the design,operation or quality ceive product throughout this <br /> of any mechanical leak detec- procedure. Plastic containers <br /> tors other than those manufac. may store static electricity which <br /> ' tured and marketed by The could discharge,causing severe <br /> Marley Pump Company under personal injury, fire and/or ex. <br /> the Red Jacket petroleum equip- plosion.Use onlyapprovedmetal <br /> ! ment identification. We, there- type containers. Use adequate <br /> fore, do not advise or condone absorbants to catch any spillage <br /> use of the information, proce. and avoid ground contamina- <br /> ! dures or equipment covered in tion. <br /> this or any other publication is- <br /> sued by The Marley Pump Com- 2. Install the AVO in the dispenser shear valve as <br /> ! pany for any equipment other shown in Figure 1. <br /> than Red Jacket petroleum <br /> equipment. <br /> ! For additional assistance with regard to the above <br /> or any,Red Jacket petroleum equipment,call us at <br /> 1-913-831-5700 or our fax number is 913-831-5172. <br /> ! 2 <br />