My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2300 - Underground Storage Tank Program
>
PR0231458
>
COMPLIANCE INFO 1986-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:50:21 PM
Creation date
11/7/2018 1:12:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2001
RECORD_ID
PR0231458
PE
2361
FACILITY_ID
FA0001196
FACILITY_NAME
SAVE ON FUEL
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
219-312-06
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\Y\YOSEMITE\420\PR0231458\COMPLIANCE INFO 1986-2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' The Diaphragm-type Leak Detector...3 STEP LEAK TEST <br /> The Red Jacket diaphragm leak If a leak is present which equals or the operator that the leak is present. <br /> detector is a pressure-sensing,dia- exceeds this amount,as much product H there are no leaks,pressure rapidly <br /> phragm-operated valve designed to escapes from the system as is metered builds in the system forcing the LLD to <br /> indicate a leak in the piping between the in through the LLD.Under this condition open to the full-flow position. In a <br /> leak detector and the dispenser. pressure cannot build up in the piping system with no leaks, it takes approxi- <br /> ' When the submerged pump is turned system.When a nozzle is opened, a mately two seconds for the complete <br /> on, a controlled amount of product poppet in the LLD moves to a position test. No further line testing takes place <br /> (three gallons per hour)is metered that restricts the flow to approximately until the line pressure drops below 1 psi. <br /> through the LLD into the piping system. 1-1/2 to 3 GPM.This is the indication to <br /> ' POSITION 1 POSITION 2 POSITION t <br /> t LESS THAN t PSI a TO ID PSI <br /> LESS <br /> FULLPRESSURE <br /> APPROX 25 PSI APPROX.2S PSI FULL PRESSURE <br /> ' POPPET FROM PULP FROM PUMP APPROX.YROM PUMP <br /> / M ERI/ i[E <br /> ' OR a QP81+ / STOI PSI + / LLEWAL +` <br /> ' 1. The Trip or Relaxed Position.Under poppet to such a position as to almost seconds to open completely.If Mere is no <br /> normal operating conditions,it is assumed stop the flow into the piping through the leakage in the system,the small flow <br /> that the lines are filled with gasoline. LLD valve poppet.In this position,all the around the metering on increases the <br /> When the system pressure is less than 1 flow must then travel around the metering line pressure to 10 psi in approximately <br /> psi,the diaphragm and poppet are in their pin which limits it to approximately 3 GPH two seconds at which point the dia- <br /> 'down'or'tripped'position. The position rate.If a simultaneous loss from the phragm will snap the poppet to Position 3. <br /> of the valve'poppet"is such as to allow system equals or exceeds this amount This all takes place in less time than it <br /> approximately 1-1/2 to 3 GPM flow into the line pressure will not build beyond this takes to reset the dispenser,walk to the <br /> ' the delivery line through a bypass point and the valve will remain in the leak car,remove the gas tank cap,insert and <br /> opening in the LLD valve poppet when sensing position with the main flow open the nozzle. <br /> the submersible pump starts.Since the blocked.If there is an attempt to dspense 3. Non-Leak Position.This position allows <br /> system is full,pressure builds rapidly and while the valve is in this position,the line full flow.The poppet will remain in this <br /> the poppet moves to the leak sensing pressure will drop,the diaphragm will position as long as the system pressure <br /> ' position assuming there is no leak respond,and the poppet will return to remains above 1 psi.At less than 1 psi, <br /> present. Position 1 where the 1-1/2 to 3 GPM will the poppet will return to Position 1 and <br /> 2. Leak Sensing Position.As the pressure flow to the dispensers.Leaks smaller the next time the pump is activated,the <br /> builds to approximately 8 to 10 psi than 3 GPM will be indicated by the LLD LLD will perform a line test. <br /> ' (rapidly)the diaphragm has moved the taking longer than approximately two <br /> t Per the above process, this product is designed and sold to detect leaks of 3 GPH or greater only. <br /> For leaks of less than 3 GPH, please consult with your Marley Pump Company representative. <br /> ' 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.