Laserfiche WebLink
Monitoring System Certification-Pao of 3 <br /> Site Address: 1071 N. Main St. @Louise <br /> Date of Testing/Servicing: 03119103 <br /> D. Results of Testing/Servicing <br /> Software Version Installed° 119.02 <br /> Coete te followin checklist: <br /> Wyes ❑ No* Is the audible alarm operational? <br /> ❑ No* Is the visual a]E-n operational'? <br /> ❑ No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation"? <br /> ®Yes ❑ No* If alarms are relayed to a remote monitoring station,is all conmm inications equipment(e.g. modem) <br /> ❑ NIA operational? <br /> yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a leak, fails to operate, or is electrically disconnected'? If yes:which sensors initiate <br /> positive shut-down'? (Check all that apply) M Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive short-down due to leaks and sensor failure/disconnection? ® Yes ❑No <br /> 17 Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> 3 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank- <br /> fill <br /> anktill point(s) and operating properly'? If so,at what percent of tank capacity does the alarm trigger'? 0 % <br /> R Yes* Q No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems'? (Cluck all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below, <br /> ®Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings'? (Attach set-up reports. if'applicable.) <br /> Yes ❑ Nn* Is all monitoring equipment operational per manufacturer's specifications'? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Replace prem PLLD, due to not reading correct pressure. <br />