My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1997-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2300 - Underground Storage Tank Program
>
PR0231431
>
COMPLIANCE INFO 1997-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 10:59:45 AM
Creation date
11/7/2018 4:09:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2004
RECORD_ID
PR0231431
PE
2361
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1071\PR0231431\COMPLIANCE INFO 1997-2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification- Pao of 3 <br /> Site Address: 1071 N. Main St. @ Louise Date of Testing/Servicing: 03/19/03 <br /> F. In -Tank Gauging 1 SIR Equipment: 1@ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perfonn leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults'? <br /> ❑Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑ No* Were all probes reinstalled properly? <br /> 0es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> ®Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD perfonnance? <br /> ❑ NIA (Check all that apply) Simulated leak reate: ® 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br /> ®Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements'? <br /> x Yes ❑ No* Was the testing apparatus properly calibrated'? <br /> ❑Yes ❑ Ni o* For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br /> ® NIA <br /> ®Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> X Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ®Yes ❑ No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test`? <br /> ®Yes ❑ No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ®Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.